亚洲免费av电影一区二区三区,日韩爱爱视频,51精品视频一区二区三区,91视频爱爱,日韩欧美在线播放视频,中文字幕少妇AV,亚洲电影中文字幕,久久久久亚洲av成人网址,久久综合视频网站,国产在线不卡免费播放

        ?

        Design of foundation treatment for a seaside project

        2019-09-10 17:55:38LiTao
        青年生活 2019年6期

        Li Tao

        Abstract:?In?this?paper,two?80,000?cubic?meters?oil?storage?tanks?are?located?on?the?seaside?of?a?petrochemical?project.For?the?treatment?of?large?area?thick?layer?soft?soil?foundation?of?seashore,crushed?stone?pile?is?used?to?compound?it,and?then?it?is?pre-pressed?by?stages?and?then?the?foundation?treatment?scheme?is?designed.

        1.Engineering?survey

        A?petrochemical?project,located?on?the?seaside,plans?to?build?two?80,000?cubic?meters?of?oil?tanks,which,according?to?planning?requirements,are?being?built?at?the?same?time.The?diameter?of?the?oil?tank?is?80?m,the?height?of?the?oil?tank?is?20?m, the?distance?between?the?two?tanks?is?120?m,the?net?distance?between?the?two?tanks?is?40?m,the?weight?of?the?filling?body?is?about?25?000?KPA,the?corresponding?base?pressure?is?72?KPA, the?maximum?height?of?oil?storage?is?16,and?the?maximum?pressure?of?the?tank?base?is?270?KPA.According?to?the?deformation?control?requirements?of?the?oil?tank?equipment?for?the?foundation,the?plane?inclination?(any?direction) is?not?greater?than?3/1000,the?uneven?settlement?of?the?tank?circumference?is?less?than?25?mm?per?10m, and?the?slope?of?the?cone?surface?of?the?tank?foundation?is?obtained.No?less?than?8/1000?and?the?settlement?difference?between?the?center?and?the?edge?of?the?tank?is?less?than?280?mm.

        2.Foundation?treatment?scheme?optimization

        The?80,000?m?3oil?tank?is?80?m?in?diameter?and?the?maximum?pressure?of?the?base?is?270?kpa,and?the?site?is?mainly?composed?of?thick?layer?soft?soil,the?strength?and?deformation?of?which?obviously?cannot?meet?the?requirements?of?80?000?m?3large?tank?foundation,so?the?foundation?treatment?must?be?carried?out..

        According?to?the?engineering?geological?conditions?of?the?site,the?third?layer?of?sandy?silty?soil?is?judged?to?be?moderate?to?severe?liquefaction,so?anti-liquefaction?treatment?must?be?carried?out,and?the?liquefaction?of?the?inland?foundation?soil?in?the?pile?length?range?can?be?eliminated?by?setting?the?gravel?pile?in?the?foundation.The?influence?depth?of?liquefaction?of?foundation?soil?during?earthquake?can?be?considered?in?the?range?of?15m?below?the?ground,so?the?pile?length?of?gravel?pile?can?be?taken?15m.After?being?treated?with?gravel?pile,the?bearing?capacity?of?the?composite?foundation?can?reach?110?kpa, which?still?can?not?meet?the?requirements?of?270kpa?of?80?000?m?3oil?tank?foundation. Therefore, it?is?necessary?to?further?strengthen?the?oil?tank?foundation?by?water?filling?preloading?method.Table?1?It?can?be?seen?that?the?52nd?layer?of?the?site?is?silty?soil?layer?with?a?depth?of?about?25m.Therefore,the?plastic?drainage?belt?of?26m?can?enter?52?layers,using?the?horizontal?permeability?of?this?layer?to?play?the?role?of?two-way?drainage.

        After?comprehensive?consideration,it?was?decided?that?the?combined?treatment?of?80?000?m?3oil?tank?foundation?with?compacted?gravel?pile?composite?foundation?and?plastic?drainage?zone?water?filling?preloading?method?was?adopted.The?layout?of?gravel?piles?is?shown?in?figure?1-1.

        4.Conclusion

        The?design?length?of?gravel?pile?is?15m,the?design?length?of?plastic?drainage?belt?is?26m,so?the?calculation?of?foundation?consolidation?parameter?is?also?divided?into?three?sections,the?first?is?the?length?of?gravel?pile,the?second?is?the?distance?from?the?bottom?of?gravel?pile?to?the?bottom?of?plastic?drainage?belt,the?second?section?is?the?distance?from?the?bottom?of?gravel?pile?to?the?bottom?of?plastic?drainage?belt,and?the?calculation?of?foundation?consolidation?parameter?;is?also?carried?out?in?three?sections. The?third?section?is?the?distance?from?the?bottom?of?the?plastic?drainage?belt?to?the?bottom?of?the?compression?layer,26?m?/ 40?m.At?the?same?time,bout?100mm?distance?was?inserted?from?the?grouting?pipe?to?the?bottom?of?the?hole,and?the?grouting?pipe?was?pulled?out?while?grouting?at?the?edge?of?the?hole.When?the?orifice?flowed?out?of?the?cement?slurry,it?stopped?after?6?days?and?8?days?later. After?6?days,the?cement?slurry?was?finally?condensed, and?the?sealing?of?the?hole?orifice?was?carried?out?again,and?the?secondary?grouting?was?carried?out?until?it?was?saturated.Grouting?water?The?ash?ratio?is:0.4?to?0.45; bound?to?the?200?mm?reinforced?mesh?of?the?6@200mm;the?C30?concrete?is?sprayed?to?the?thickness?of?100?mm,the?spacing?of?the?crushed?stone?piles?is?s?= 1.5m,and?the?pile?length?is?taken?as?L?= 15?m?in?consideration?of?the?requirements?for?liquefaction?treatment?of?the?foundation?soil.

        reference documentation

        [1]Technical Code for Building Foundation treatment (JGJ79-2012)[S].Beijing:China Construction Industry Press, 2012

        [2]Code for Design of concrete structures (GB50010-2010) [S].Beijing:China Construction Industry Press,2010

        [3]Teng Yanjing,Wang Weidong,Kang Jingwen,Liu Jianguo,Li Jianmin.New advances in basic engineering technology[J].Journal of Civil Engineering,2016,20(04):15/21

        [4]Wang Wei,Yang Min,Yang Hua.Comparative analysis of short-short pile foundation and other types of foundation[J]. Journal of Architectural structures, 2006, 39 (01): 34 / 40

        国产成人亚洲合集青青草原精品| 欧美video性欧美熟妇| 国产成人久久精品激情| 免费看国产成年无码av| 亚洲成av在线免费不卡| 国产一区二区长腿丝袜高跟鞋| 国产精品人妻一区二区三区四| 亚洲av成人综合网| 国产一区二区三区国产精品| 亚洲av色香蕉一区二区三区潮| 国产精品天干天干| 色老头在线一区二区三区| 久久精品国产亚洲一区二区| 国产精品亚洲最新地址| 免费a级毛片18禁网站| 国产美女久久精品香蕉69| 亚洲大片免费| 日本高清一区二区在线播放| 亚洲 日本 欧美 中文幕| 丰满人妻在公车被猛烈进入电影| 久久中文字幕久久久久| 一区二区三区国产天堂| 伊人久久大香线蕉av波多野结衣| 久久精品人人爽人人爽| 国产一区亚洲欧美成人| 久久婷婷综合色一区二区| 国产三级精品三级| 国产精品久久久久免费a∨| 国产精品性一区二区三区| av免费在线播放视频| 无码免费一区二区三区| 久久99国产亚洲高清| 免费观看国产激情视频在线观看| 午夜精品久久久久久久99老熟妇| 日日噜噜噜夜夜爽爽狠狠| 国产成人自产拍免费视频| 亚洲一区二区三区日韩在线观看| 久久久久久九九99精品| 欧美日韩另类视频| 久久国产女同一区二区| 亚洲av午夜成人片精品电影|