        Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

        2017-12-26 00:05:48李成寶黃俊
        關(guān)鍵詞:工程

        ◎李成寶 黃俊

        Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

        ◎李成寶 黃俊

        A large foreign project, one of the world's largest LNG plant construction projects, 36 core process modules in construction with a total weight of 200,000 tons approximately, project duration started from July 2014 and will be completed in July 2017. The variation and workload confirmation transmission management system is established and implemented with exploration and innovation in this project, the author elaborated variation and workload confirmation transmission system by extraction of optimized cases in order to provide a practical reference for variation and workload confirmation management work in oil and gas module construction projects.

        Preface

        Due to the particularity of variation and workload confirmation work in this large foreign project, the author perform classification management to the variation and workload confirmation transmission system which is divided into discipline engineering and mechanical and electrical installation engineering according to bidding and contract awarding mode.

        Variation and workload confirmation transmission system optimization case analysis

        Variation confirmation transmission optimization case

        Current transmission path: 1 variation submitted by subcontractors (with paper variation account)-2 PMT discipline engineers review and sign-3 PMT document control engineers sort-4 subcontractors document control engineers register, receive, sign, distribute, and transfer to PMT after its leader’s signature-5 PMT document control engineers register, receive, sign, distribute to module managers for signature and transfer to design department-6 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature -7 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-8 PMT discipline engineers review and signleaders approve

        Optimized transmission path: 4 subcontractors document control engineers register, receive, sign, distribute and transfer to design department after its leader’s signature-5 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature-6 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-7 PMT discipline engineers submitted to module managers for signature, then PMT discipline engineers review and submitted to leaders for approval

        Workload confirmation transmission optimization case

        At the early period of this project, PMT designate department A responsible for subcontracting management of mechanical and electrical installation engineering and small structure bulk materials division and transmission. During the process of implementation, it was discovered that column internals, electric heat tracing were unable to be divided by discipline. Afterward it was determined that functional management department A responsible for electric heating and PMT construction department A responsible for column internals. Due to subcontracting contracts signing and site actual situation, special workload confirmation sheet increasingly but document control engineers cannot confirm transmission direction according to documents. Afterward it was determined that PMT discipline engineers to make special mark on account, this method can effectively avoid the probability of error, mistake, omit and others in the process of transmission. After optimization, it was concluded that functional management department A responsible for discipline engineering subcontracting management, electric heat tracing and special workload transmission and signing work. PMT construction department A responsible for subcontracting management of mechanical and electrical installation project, bulk materials, column internals transmission and signing work in order to ensure each discipline workload confirmation transmission in good order and synchronously with variation confirmation transmission.

        Conclusion

        After years of development, domestic project management theory has basically formed a unique project management system and project management personnel have adequate knowledge about project management knowledge system. The author devotes himself into the practice, innovation and implementation of variation and workload confirmation transmission management system, and this paper extracted two optimized cases to perform analysis in order to provide a reference only for variation and workload confirmation and management work in oil and gas module construction projects.

        (作者單位:海洋石油工程(青島)有限公司)

        猜你喜歡
        工程
        《工程爆破》》征稿征訂
        工程爆破(2022年3期)2022-07-26 01:58:56
        《工程爆破》征稿簡則
        工程爆破(2022年2期)2022-06-17 14:13:56
        子午工程
        太空探索(2016年6期)2016-07-10 12:09:06
        工程
        工程
        工程
        工程
        工程
        工程
        工程
        人妻中文久久人妻蜜桃| 精品人无码一区二区三区| 国产99在线 | 亚洲| 国产精品va在线播放我和闺蜜| 亚洲VA欧美VA国产VA综合| 国产精品国产三级国a| 国产在线无码一区二区三区视频 | 中文字幕乱偷乱码亚洲| 亚洲小少妇一区二区三区| 亚洲中文字幕午夜精品| 天堂国精产品2023年| 亚洲电影一区二区三区 | 亚欧美日韩香蕉在线播放视频| 亚洲精品夜夜夜| 久久婷婷免费综合色啪| 午夜一区二区视频在线观看| 蜜桃日本免费看mv免费版 | 一本色道久久爱88av| 极品美女扒开粉嫩小泬| 永久免费的拍拍拍网站| 国产一区二区黄色的网站| 久久天堂综合亚洲伊人hd妓女| 成年人黄视频大全| 精品国产一区二区三区久久狼| 日韩一区二区三区精品视频| 欧美乱人伦人妻中文字幕| 99热这里只有精品3| 日韩美女人妻一区二区三区 | 午夜探花在线观看| 国产成人高清精品亚洲一区| 日本av在线一区二区| 无码av免费一区二区三区| 久草热这里只有精品在线| 少妇被啪出水在线视频| 日本阿v片在线播放免费| 丰满少妇人妻无码专区| 色婷婷精品国产一区二区三区 | 国产成人精品a视频| 高清国产日韩欧美| 国产精品久久久看三级| 亚洲精品国精品久久99热|