        Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

        2017-12-26 00:05:48李成寶黃俊
        關(guān)鍵詞:工程

        ◎李成寶 黃俊

        Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

        ◎李成寶 黃俊

        A large foreign project, one of the world's largest LNG plant construction projects, 36 core process modules in construction with a total weight of 200,000 tons approximately, project duration started from July 2014 and will be completed in July 2017. The variation and workload confirmation transmission management system is established and implemented with exploration and innovation in this project, the author elaborated variation and workload confirmation transmission system by extraction of optimized cases in order to provide a practical reference for variation and workload confirmation management work in oil and gas module construction projects.

        Preface

        Due to the particularity of variation and workload confirmation work in this large foreign project, the author perform classification management to the variation and workload confirmation transmission system which is divided into discipline engineering and mechanical and electrical installation engineering according to bidding and contract awarding mode.

        Variation and workload confirmation transmission system optimization case analysis

        Variation confirmation transmission optimization case

        Current transmission path: 1 variation submitted by subcontractors (with paper variation account)-2 PMT discipline engineers review and sign-3 PMT document control engineers sort-4 subcontractors document control engineers register, receive, sign, distribute, and transfer to PMT after its leader’s signature-5 PMT document control engineers register, receive, sign, distribute to module managers for signature and transfer to design department-6 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature -7 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-8 PMT discipline engineers review and signleaders approve

        Optimized transmission path: 4 subcontractors document control engineers register, receive, sign, distribute and transfer to design department after its leader’s signature-5 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature-6 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-7 PMT discipline engineers submitted to module managers for signature, then PMT discipline engineers review and submitted to leaders for approval

        Workload confirmation transmission optimization case

        At the early period of this project, PMT designate department A responsible for subcontracting management of mechanical and electrical installation engineering and small structure bulk materials division and transmission. During the process of implementation, it was discovered that column internals, electric heat tracing were unable to be divided by discipline. Afterward it was determined that functional management department A responsible for electric heating and PMT construction department A responsible for column internals. Due to subcontracting contracts signing and site actual situation, special workload confirmation sheet increasingly but document control engineers cannot confirm transmission direction according to documents. Afterward it was determined that PMT discipline engineers to make special mark on account, this method can effectively avoid the probability of error, mistake, omit and others in the process of transmission. After optimization, it was concluded that functional management department A responsible for discipline engineering subcontracting management, electric heat tracing and special workload transmission and signing work. PMT construction department A responsible for subcontracting management of mechanical and electrical installation project, bulk materials, column internals transmission and signing work in order to ensure each discipline workload confirmation transmission in good order and synchronously with variation confirmation transmission.

        Conclusion

        After years of development, domestic project management theory has basically formed a unique project management system and project management personnel have adequate knowledge about project management knowledge system. The author devotes himself into the practice, innovation and implementation of variation and workload confirmation transmission management system, and this paper extracted two optimized cases to perform analysis in order to provide a reference only for variation and workload confirmation and management work in oil and gas module construction projects.

        (作者單位:海洋石油工程(青島)有限公司)

        猜你喜歡
        工程
        《工程爆破》》征稿征訂
        工程爆破(2022年3期)2022-07-26 01:58:56
        《工程爆破》征稿簡則
        工程爆破(2022年2期)2022-06-17 14:13:56
        子午工程
        太空探索(2016年6期)2016-07-10 12:09:06
        工程
        工程
        工程
        工程
        工程
        工程
        工程
        69精品国产乱码久久久| 欧美一级视频精品观看| 又色又爽又高潮免费视频观看| 四川丰满少妇被弄到高潮| 中文字幕巨乱亚洲| 亚洲国产精品成人一区二区三区| 国产av激情舒服刺激| 黑人巨大跨种族video| 亚洲AV伊人久久综合密臀性色| 国产成人精品中文字幕| 一区二区三区国产免费视频| 亚洲av无码一区二区三区观看| 亚洲 国产 哟| 日韩精品久久伊人中文字幕| 国产成人无码av一区二区在线观看| 中文人妻无码一区二区三区在线| 亚洲阿v天堂2018在线观看| 久久精品国产亚洲av沈先生| 99国产精品99久久久久久| 成人免费xxxxx在线观看| 五月天激情小说| av天堂吧手机版在线观看| 中文字幕有码手机视频| 波多野结衣在线播放| 婷婷丁香五月中文字幕| 99国产综合精品-久久久久| 成人av资源在线播放| 成人乱码一区二区三区av| 亚欧AV无码乱码在线观看性色| 国产天堂av手机在线| 国产视频一区二区三区在线免费| 男人j进女人j啪啪无遮挡| 51精品视频一区二区三区| 美女被强吻并脱下胸罩内裤视频| 日韩精品一区二区三区在线视频 | 青青草针对华人超碰在线| 亚洲成人福利在线视频| 亚洲精品无码不卡在线播放he | 久久久亚洲女精品aa| 在线观看一级黄片天堂| 日韩插啊免费视频在线观看|