胡惟璇 杜妍
摘要:文章通過構(gòu)建船舶交通管理系統(tǒng)(縮寫VTS)綜合評估指標體系,對A省轄區(qū)5個VTS中心的服務效率進行排序。研究結(jié)果表明,信息熵-未確知測度評價法切實可行,為全面科學評估VTS綜合運行效果提供了方法和指導,為VTS建設和發(fā)展提供了有益的參考。
關鍵詞:信息熵-未確知測度評價法;船舶交通管理系統(tǒng);VTS;綜合評估;海事系統(tǒng) 文獻標識碼:A
中圖分類號:U676 文章編號:1009-2374(2016)06-0015-03 DOI:10.13535/j.cnki.11-4406/n.2016.06.008
1 概述
隨著海事的不斷發(fā)展,船舶交通管理系統(tǒng)(VTS)成為實施船舶交通服務和管理重要的手段之一,其在海事管理中的地位和作用日趨凸顯。國際海事組織(IMO)在《VTS指南》中對VTS的定義是:由主管機關實施,用于提高船舶交通安全和效率及保護環(huán)境的服務,在VTS覆蓋水域內(nèi),這種服務應能與交通相互作用并對交通形勢變化做出反應,為船舶交通服務。
為準確全面評估VTS的效用,對VTS做綜合評估是必要的:一方面,綜合評估可判斷VTS作為一個綜合性海事管理和服務平臺是否完成了應有的信息服務、助航服務、交通組織等多項職能;另一方面,綜合評估結(jié)果可為VTS未來的建設和發(fā)展提供有益的建議。
2 基于信息熵-未確知測度評價法的VTS綜合評估模型
熵指變量的不確定性概率大小,可以用來表示信息的有序程度,引入信息熵來度量信息源中平均信息量的大小,從而表示整個信息系統(tǒng)的平均不確定程度,并且信息越有序,信息熵就越低,信息源越不確定,信息熵就越大。VTS的評價數(shù)據(jù)涉及方方面面,且具有大量不確定因素,信息熵可將其量化,并向決策者提供更多有用的信息。信息熵-未確知測度的評價步驟如圖1所示:
圖1 信息熵-未確知測度的評價步驟
2.1 VTS評價指標體系的建立
根據(jù)VTS定義結(jié)合當前用戶實際運行中對VTS的功能需求,將VTS綜合評估的重點放在系統(tǒng)運行與管理能力、資源服務能力兩方面。在向海事局專家咨詢四輪,意見趨于一致后,構(gòu)建VTS綜合評估指標體系,見表1。
2.2 評價矩陣的確定及評價指標的篩選
設對于個評價對象通過個評價指標對其進行評估,設評價對象向量,評價指標向量,則,其中,為對于指標對象的評價值,評價矩陣為:
通過信息熵的概念公式計算指標的熵值和熵權(即指標區(qū)分度),并刪除對評價對象而言幾乎無區(qū)分度的指標,將約簡后的指標體系進行重新整合。
2.3 單指標未確知測度
單指標未確知測度是指通過確定指標的評價等級和單指標測度函數(shù)來計算各指標的測度值,進而得到指標的測度空間矩陣。具體如下:
對tij設個評價等級,則評價向量,
且為有序向量,即,則有分類標準矩陣,且()為根據(jù)未確知測度模型得到的屬于等級的未確知度,除此之外,單指標測度需要符合以下特性:
非負有界性:
可加性:
歸一性:
2.4 各指標權重的確定
通過信息熵的定義得到指標的峰值為:
(1)
式中:p為等級數(shù);為單指標測度;指標的重要度可用Vij表示,則的權重為:
(2)
其中,。
2.5 多指標未確知測度
根據(jù)權重可得評價對象的綜合未確知測度,則多指標未確知測度矩陣為:
(3)
2.6 置信度識別
若滿足,對置信度計算得 (4)
則認為屬于等級。
對ti進行排序,可以將下式作為評分規(guī)則計算:
(5)
其中對以-2為公差的等差數(shù)列取值,并依據(jù)對比較并排序分析。
3 基于信息熵-未確知測度評價法的VTS綜合評估模型應用
以A省轄區(qū)內(nèi)5個VTS中心(以A-E標識)為評估對象。根據(jù)式(1)、式(2)可得A省5個VTS中心評估指標權重為:
WAj=(0.054013556,0.094873234,0.094873234,0.059590985,0.094873234,0.070682591,0.054609884,0.054013556,0.094873234,0.094873234,0.054013556,0.070682591,0.054013556,0.054013556)
WBj=(0.048863623,0.084890309,0.048863623,0.084890309,0.084890309,0.063245098,0.063245098,0.048330043,0.084890309,0.084890309,0.084890309,0.084890309,0.084890309,0.048330043)
WCj=(0.093317718,0.053127964,0.093317718,0.069523698,0.053714515,0.069523698,0.069523698,0.058613947,0.093317718,0.053127964,0.093317718,0.093317718,0.053127964,0.053127964)
WDj=(0.046372063,0.081451175,0.046372063,0.046372063,0.081451175,0.081451175,0.046372063,0.081451175,0.081451175,0.081451175,0.081451175,0.081451175,0.081451175,0.081451175)
WEj=(0.049843475,0.087548608,0.049843475,0.049843475,0.087548608,0.087548608,0.087548608,0.049843475,0.050393764,0.049843475,0.087548608,0.087548608,0.087548608,0.087548608)
根據(jù)式(3)可得各個評價對象對應的各指標未確知測度矩陣為:
根據(jù)多指標未知測度矩陣,進行各個對象的排序,取,由式(4)可得:,,,即B中心和E中心VTS綜合運行水平很好,A中心和D中心VTS綜合運行水平好,C中心一般。
取代入式(5),則(3.085763,5.942322,2.42076,5.441135,3.37411),即,故5個VTS中心評價的綜合效用從高到低排序為VTS(B)、VTS(D)、VTS(E)、VTS(A)、VTS(C)。
4 結(jié)論及建議
本文系統(tǒng)評估了A省VTS運行的有效性、軟件及管理的實施情況,并結(jié)合人員與管理模式等因素,從VTS構(gòu)架、功能、建設運行情況、人員監(jiān)管模式等方面進行深入評估。研究結(jié)果表明,信息熵-未確知測度評價法適合VTS綜合評估且切實可行,為更全面科學地評估VTS綜合運行效果提供了方法和指導,為VTS建設和發(fā)展提供了有益的參考。具體建議包括以下兩個方面:(1)從評估最終結(jié)果來看,VTS(B)運行效果最佳,VTS(D)和(E)居中,VTS(A)和(C)隨后。在硬件設施基本相同的情況下,VTS運行功效取決于海事值班人員及海事中心領導創(chuàng)新及管理能力,應加強對VTS國際化的認識和研究,及時調(diào)整不適應VTS管理的工作模式,建設符合國際標準的VTS機構(gòu)和操作管理員工隊伍。(2)VTS中心的綜合能力均有發(fā)展提升空間,主要表現(xiàn)在對VTS的功能應用和增值功能的開發(fā)利用上。建議海事管理部門以船舶監(jiān)督和服務為主導,加強VTS建設標準化研究,建設集水上交通信息中心、控制中心、指揮中心為一體的現(xiàn)代化船舶交通管理體系。
參考文獻
[1] 國際海事組織.VTS指南[S].1997.
[2] 郭亞軍.綜合評價理論、方法及應用[M].北京:科學出版社,2007.
(責任編輯:周 瓊)