何長(zhǎng)江
摘要:為解決既有橋梁改建過程中,施工對(duì)交通行車和橋下管網(wǎng)的影響問題,本文對(duì)傳統(tǒng)的框構(gòu)橋頂進(jìn)法進(jìn)行改進(jìn),提出門式剛構(gòu)拖拉法。結(jié)合大連市東北路拓寬改造工程,對(duì)所提工法的工藝原理和流程進(jìn)行了介紹,并對(duì)該工法在施工過程中的操作重點(diǎn)和難點(diǎn)進(jìn)行了分析。
Abstract: In order to solve the problem of the influence of construction on traffic and bridge pipe network during the reconstruction process of existing bridges, this paper improves the traditional frame structure bridge jacking method and proposes the portal rigid frame drag method. Combined with the widening and reconstruction project of the northeast road in Dalian, the process principle and process of the proposed method are introduced, and the operation focus and difficulties of the construction method in the construction process are analyzed.
關(guān)鍵詞:橋梁施工;穿越;門式剛構(gòu);拖拉法
Key words: bridge construction;crossing;portal rigid structure;drag method
中圖分類號(hào):U448.23? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 文獻(xiàn)標(biāo)識(shí)碼:A? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 文章編號(hào):1006-4311(2019)18-0156-04
0? 引言
隨著國(guó)民經(jīng)濟(jì)的快速發(fā)展,城市進(jìn)入了大開發(fā)、大發(fā)展的新的歷史時(shí)期,隨之而來的是城市交通壓力的增加,特別是貫穿老城區(qū)內(nèi)既有下穿框構(gòu)橋,因建造年代久、孔徑小、橋下城市管網(wǎng)密布動(dòng)遷影響范圍大、拆遷費(fèi)用高已經(jīng)成為束縛城市交通發(fā)展的瓶頸,為了解決這一難題,在保證城市主干道交通和鐵路行車不中斷、既有橋下基礎(chǔ)設(shè)施不遷移的前提下進(jìn)行施工,中鐵九局集團(tuán)開發(fā)的門式剛構(gòu)拖拉施工工法,在大連市東北路拓寬改造工程中的運(yùn)用,巧妙的將傳統(tǒng)的框構(gòu)橋頂進(jìn)法創(chuàng)新為門式剛構(gòu)拖拉法施工,是對(duì)下穿鐵路立交橋工程結(jié)構(gòu)的全新的構(gòu)思、設(shè)計(jì)和施工實(shí)踐[3-5]。在國(guó)內(nèi)外權(quán)威刊物和重要學(xué)術(shù)論文集中均未發(fā)現(xiàn)有類似的報(bào)道,本工法在解決城市既有橋梁改建施工與城市交通和鐵路運(yùn)營(yíng)相互影響方面效果明顯,施工過程中城市道路和鐵路運(yùn)輸均不中斷,不僅橋梁本體施工安全,還妥善解決了工程對(duì)周邊交通的影響,城市地下管網(wǎng)不用動(dòng)遷,大大減少了投資額,技術(shù)先進(jìn),具有顯著的社會(huì)經(jīng)濟(jì)效益。
1? 工藝原理及流程
門式剛構(gòu)拖拉法適用下穿構(gòu)筑物改擴(kuò)建施工,與傳統(tǒng)的頂進(jìn)方法相比,能在保證橋上鐵路正常運(yùn)營(yíng)和橋下公路交通不中斷情況下,利用鐵路的“天窗”作業(yè)時(shí)間將門式剛構(gòu)拖拉到指定位置。尤其是在城市交通主干道下穿鐵路(公路)橋梁改擴(kuò)建中,城市主干道影響范圍廣無法中斷交通,橋位地下管網(wǎng)動(dòng)動(dòng)遷量大,影響范圍廣,投資額度大幅度增加的情況下,本法施工優(yōu)勢(shì)明顯。相對(duì)于傳統(tǒng)的框構(gòu)橋頂進(jìn)法,是對(duì)下穿工程結(jié)構(gòu)的新構(gòu)思、新技術(shù),該工法具有以下優(yōu)點(diǎn)。
①占用施工場(chǎng)地面積小,避免了施工對(duì)城市道路的全部占用,保證了城市道路交通順暢,對(duì)周邊交通影響范圍小,無需對(duì)既有橋下的城市地下管網(wǎng)遷移,工程投資少,施工周期短。②施工進(jìn)度快,封鎖時(shí)間短,拖拉法施工工藝簡(jiǎn)單易于操作,對(duì)城市交通和鐵路運(yùn)輸干擾少,施工過程安全可靠。③拖拉法使用的機(jī)具簡(jiǎn)單,主要機(jī)具為預(yù)應(yīng)力穿心式千斤頂,材料為預(yù)應(yīng)力鋼絞線,可操作性強(qiáng),易于推廣,工程質(zhì)量可控。
門式剛構(gòu)拖拉法的原理是在傳統(tǒng)的框構(gòu)頂進(jìn)方法的基礎(chǔ)上,將構(gòu)造物由一般千斤頂并聯(lián)頂進(jìn)施工改進(jìn)為由穿心式千斤頂串聯(lián)拖拉施工,其工藝流程如圖1所示。
并聯(lián)頂進(jìn)施工由于千斤頂工作行程小,因此,當(dāng)要求頂推構(gòu)造物至相當(dāng)大距離時(shí),就必須分多次進(jìn)行,千斤頂一次行程小于500毫米,需配備大量的傳力柱,占地面積大,更換傳力柱頻繁,框構(gòu)頂進(jìn)速度慢,需吊車配合作業(yè),從基坑開挖到施工結(jié)束中斷既有道路時(shí)間一般至少在3個(gè)月以上時(shí)間,且整個(gè)作業(yè)范圍內(nèi)的地下管網(wǎng)需全部動(dòng)遷,其缺點(diǎn)是占地面積大,需長(zhǎng)時(shí)間中斷道路施工,工藝相對(duì)復(fù)雜,施工進(jìn)度慢,影響范圍廣,地下設(shè)施動(dòng)還遷費(fèi)用比重大。
串聯(lián)拖拉施工是將兩臺(tái)穿心式千斤頂串聯(lián)為一組,相對(duì)門式剛構(gòu)立墻配置,用鋼絞線將構(gòu)造物與千斤頂連接起來連續(xù)拖拉,克服千斤頂工作行程小的缺陷,免除了更換傳力柱作業(yè),無需吊車配合,門式剛構(gòu)拖拉速度快,每小時(shí)可達(dá)8米以上,由于門式剛構(gòu)設(shè)計(jì)取消了構(gòu)造物的底板,整個(gè)作業(yè)范圍內(nèi)的地下管網(wǎng)不需要?jiǎng)舆w,其優(yōu)點(diǎn)是占地面積小,不需長(zhǎng)時(shí)間中斷市政道路交通施工,工藝相對(duì)簡(jiǎn)單,施工進(jìn)度快,影響范圍小,地下設(shè)施不需要?jiǎng)舆w,能大量節(jié)約不必要的投資。
串聯(lián)拖拉施工雖然克服了并聯(lián)頂進(jìn)施工缺點(diǎn),但是由于穿心式千斤頂相對(duì)于一般千斤頂動(dòng)力小,串聯(lián)拖拉施工中要相對(duì)門式剛構(gòu)立墻配置,可配置千斤頂組少,施工中為了解決總拉力有限的問題,就必須盡量減少門式剛構(gòu)在拖拉施工中的摩擦力阻力,提高滑道的剛度和精度,有效降低剛構(gòu)與滑道間的摩擦系數(shù),是減少門式剛構(gòu)在拖拉施工中的摩擦力阻力的關(guān)鍵。
為了提高滑道的剛度和精度,如圖2所示,施工設(shè)計(jì)采用人工挖孔樁基礎(chǔ),鋼筋混凝土槽型連續(xù)基礎(chǔ)梁滑道,滑道槽內(nèi)鑲嵌厚鋼板,門式剛構(gòu)立墻腳部外包鋼板,預(yù)留間隙為1.5cm。為了降低剛構(gòu)與滑道間的摩擦系數(shù),在門式剛構(gòu)立墻底部與滑道槽內(nèi)鑲嵌厚鋼板間鋪設(shè)四氟板和不銹鋼板,四氟板上涂抹黃油,將摩擦系數(shù)極限值控制在0.1以內(nèi)。為了控制門式剛構(gòu)立墻的橫向位移,在門式剛構(gòu)立墻底部側(cè)面與滑道縫隙間每隔兩米放置一塊1cm厚的四氟板限位塊,將門式剛構(gòu)立墻的橫向位移控制在1cm以內(nèi)。
2? 工法應(yīng)用實(shí)例
門式剛構(gòu)拖拉法在大連市東北路拓寬改造工程中得到應(yīng)用,在具體施工過程中,需對(duì)設(shè)備配置檢算、系統(tǒng)構(gòu)建、同步控制、以及施工監(jiān)測(cè)等環(huán)節(jié)進(jìn)行準(zhǔn)確的設(shè)計(jì)計(jì)算。下文以大連市東北路拓寬改造工程(如圖3所示)為例,對(duì)該工法的操作要點(diǎn)進(jìn)行介紹。
2.1 拖拉設(shè)備配置檢算
沈大線鐵路橋自重及荷載:
結(jié)構(gòu)自重=(33.51+47.58+42.68+47.58+33.51)t/m×8.3m=1700t
鋼軌=0.06t/m×25m×4根×2組×2處=24t
枕木=0.35t/根×84根×2處=59t
道碴=1.65t/m3×2m3/m×60.5m×2處=399t
以上合計(jì)總重=1700t+24t+59t+399t=2182t
不銹鋼板與四氟板的摩擦系數(shù)取μ=0.1(參考滑動(dòng)支座摩擦系數(shù)為0.05-0.06及碼頭線行走實(shí)際平均摩擦系數(shù)為0.05、極限值為0.1)、荷載附加系數(shù)k=1.2,設(shè)計(jì)采用8?覫s 15.24鋼絞線進(jìn)行拉進(jìn),鋼絞線橫截面積Ap=140mm2×8根=1120mm2;拖拉端控制應(yīng)力δ=N/Ap (N為拖拉端的拉力)。
沈大線鐵路橋拖進(jìn)牽引力N=μG=0.1×2182t×1.2=2618kN
1、5號(hào)立柱需牽引力:N=μG=33.51/204.86×2618kN=428kN
2、4號(hào)立柱需牽引力:N=μG=47.58/204.86×2618kN=608kN
3號(hào)立柱需牽引力:N=μG=42.68/204.86×2618kN=545kN
沈大線鐵路橋牽引端控制應(yīng)力:
1、5號(hào)立柱:δ=N/Ap=428000/1120=382MPa<[δ]=1395MPa
2、4號(hào)立柱:δ=N/Ap=608000/1120=542MPa<[δ]=1395MPa
3號(hào)立柱:δ=N/Ap=545000/1120=487MPa<[δ]=1395MPa
19?覫s 15.24鋼絞線[δ]=1395MPa,因此能夠滿足拖進(jìn)要求。
2.2 拖拉系統(tǒng)構(gòu)建
設(shè)牽引平移點(diǎn)5個(gè),每一個(gè)平移點(diǎn)中,配置1臺(tái)額定平移力為200噸的連續(xù)平移千斤頂,每臺(tái)頂配置8根Ф15.24、強(qiáng)度為1860MPa級(jí)鋼絞線,鋼絞線安裝采用墩后預(yù)埋錨墊板安裝承重錨,如圖4所示。平移系統(tǒng)設(shè)備分布及牽引如圖5所示。
各牽引點(diǎn)位置同步控制:在牽引體系中,按最小值相對(duì)誤差計(jì)算平衡誤差實(shí)施模糊控制??刂葡到y(tǒng)牽引點(diǎn)平衡的誤差計(jì)算方法圖解如圖6。
各個(gè)誤差值的計(jì)算:
H2值為最小則:
ΔH1=H1-H2? ΔH2=H2-H2=0? ΔH3=H3-H2? ΔH4=H4-H2
按誤差控制調(diào)節(jié)各頂、各吊點(diǎn)調(diào)節(jié)閥組的通用計(jì)算機(jī)流程如下:
起動(dòng)平衡控制→ΔH1≥δ(δ:牽引點(diǎn)同步誤差為10 mm)→設(shè)置調(diào)節(jié)1#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH1≤1mm→停止調(diào)節(jié)1#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH2≥δ→設(shè)置調(diào)節(jié)2#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH2≤1mm→停止調(diào)節(jié)2#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH3≥δ→設(shè)置調(diào)節(jié)3#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH3≤1mm→停止調(diào)節(jié)3#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH4≥δ→設(shè)置調(diào)節(jié)4#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH4≤1mm→停止調(diào)節(jié)4#吊點(diǎn)調(diào)節(jié)閥組閥→關(guān)閉平衡→ΔH5≥δ→設(shè)置調(diào)節(jié)5#吊點(diǎn)調(diào)節(jié)閥組閥→ΔH5≤1mm→停止調(diào)節(jié)5#吊點(diǎn)調(diào)節(jié)閥組閥→關(guān)閉平衡……。平衡調(diào)節(jié)以牽引總程同步誤差為主,千斤頂伸缸行程為輔。
2.3 拖拉過程同步控制
平移剛構(gòu)橋在牽引過程中牽引總程的平衡是由穩(wěn)壓調(diào)節(jié)器適時(shí)調(diào)控完成的;由于鋼絞線是柔性的,它不能約束剛構(gòu)橋在運(yùn)行過程中的慣性動(dòng)量,所以剛構(gòu)各個(gè)狀態(tài)必須由外設(shè)檢測(cè)裝置來檢測(cè),提供信息應(yīng)時(shí)刻監(jiān)測(cè)剛構(gòu)的步進(jìn)軌跡及工況,在平移施工過程中,根據(jù)專業(yè)測(cè)量人員對(duì)平移剛構(gòu)運(yùn)行偏差情況作相應(yīng)的調(diào)整。牽引平移的過程必須在60分鐘內(nèi)完成(不括在平移中由于其他原因(如滑道、導(dǎo)向等原因)可能造成延誤的處理時(shí)間),平移速度最小為7分鐘/每米,糾偏處理按20分鐘考慮,過程對(duì)于設(shè)備的配置采用連續(xù)式牽引系統(tǒng)。
其在牽引的過程中有停頓的時(shí)間,可利用這個(gè)時(shí)段確定整個(gè)結(jié)構(gòu)的運(yùn)行狀態(tài),提前確認(rèn)結(jié)構(gòu)是否需要調(diào)整,這個(gè)系統(tǒng)平移速度平均為每小時(shí)8米以上,滿足拖拉進(jìn)度要求。
2.4 拖拉過程縱向位移的施工監(jiān)測(cè)
拖拉時(shí),采用剛構(gòu)橋?qū)嶋H位移為準(zhǔn)、千斤頂行程為副的方法進(jìn)行監(jiān)控,設(shè)專人通過粘貼在承臺(tái)表面的標(biāo)尺對(duì)各滑道剛構(gòu)橋的5個(gè)立墻所處滑道上設(shè)置基準(zhǔn)點(diǎn),配備專人進(jìn)行位移、速度、偏差等指標(biāo)監(jiān)控,5點(diǎn)同步牽引、各牽引點(diǎn)形成、位移偏差、縱向設(shè)定值為10-15mm,橫向設(shè)定值為5-10mm,10mm內(nèi)監(jiān)控、10-15mm為糾偏、15mm以上停止。在行進(jìn)過程中始終堅(jiān)持如出現(xiàn)偏差超過+5mm情況,則必須調(diào)整油泵流量,馬上進(jìn)行調(diào)整,使剛構(gòu)橋位移保持在可控范圍之內(nèi)。
3? 結(jié)論
本文結(jié)合大連市東北路拓寬改造工程,對(duì)門式剛構(gòu)拖拉施工工法在操作中所需注意的具體問題進(jìn)行了分析,得出的主要結(jié)論如下:
①門式剛構(gòu)相對(duì)框構(gòu)基本上為不閉合結(jié)構(gòu),由于其下部是開放式的,剛構(gòu)立墻的橫向位移控制是保障門式剛構(gòu)在拖拉過程中結(jié)構(gòu)質(zhì)量的關(guān)鍵,按設(shè)計(jì)要求門式剛構(gòu)在拖拉過程中,橫向位移控制在1.5cm以內(nèi),施工中采取橫向限位擋塊,確保門式剛構(gòu)每個(gè)立墻橫向位移控制在1cm以內(nèi)。
②滑道的精度和剛度會(huì)引起門式剛構(gòu)在滑動(dòng)的過程中摩擦阻力的增加,有可能直接造成門式剛構(gòu)拖拉中途停頓,無法保證在計(jì)劃時(shí)間內(nèi)完成施工任務(wù),影響鐵路和城市道路的交通。
③滑道縱向限位在牽引中占有很重要的地位,它起著控制剛構(gòu)慣性動(dòng)量釋放的作用,無論牽引設(shè)備的測(cè)量、控制如何優(yōu)越都不能控制物體慣性動(dòng)量的偏移,必須設(shè)置限位裝置,當(dāng)其摩擦系數(shù)越小其慣性動(dòng)量的影響就越大,限位的制作必須設(shè)置在滑道上并與滑道連為一體才能達(dá)到其使用效果。
④在牽引施工中,摩擦阻力是隨時(shí)變化的,對(duì)于在封鎖時(shí)點(diǎn)內(nèi)的施工必須按最壞的異常情況考慮牽引力的要求;由于剛構(gòu)的結(jié)構(gòu)復(fù)雜,要使?fàn)恳υ跔恳胁▌?dòng)不要太大,則要求滑道的摩擦系數(shù)越小越好,同時(shí),摩擦系數(shù)較小,也能使結(jié)構(gòu)受在平移的過程中受到的力偏小。
參考文獻(xiàn):
[1]劉文武,張志才,范君.晉豫魯鐵路通道跨京廣線鋼桁梁拖拉法施工技術(shù)[J].鐵道建筑,2014(09):21-23.
[2]程熱香.拖拉法安裝過橋管道的施工技術(shù)[J].建筑施工,2015,37(08):986-988.
[3]李航.鐵路門式剛構(gòu)橋跨越既有框構(gòu)橋U型槽的設(shè)計(jì)與施工[J].科技創(chuàng)新與應(yīng)用,2017(26):110-111.
[4]夏玉強(qiáng).80m單線鐵路鋼桁梁拖拉法架設(shè)技術(shù)[J].國(guó)防交通工程與技術(shù),2012,10(04):43-46,19.
[5]王驊,蘆可琪.安慶晴嵐路預(yù)應(yīng)力混凝土門式剛構(gòu)橋設(shè)計(jì)[J].城市道橋與防洪,2011(10):45-48,7.