        Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data

        2014-08-12 02:31:00HUTiansong胡天松HUANGHongzhong黃洪鐘WANGXiaoming王曉明LIGuangGAOSuhe高素荷
        關(guān)鍵詞:胡天王曉明

        HU Tian-song (胡天松), HUANG Hong-zhong (黃洪鐘), WANG Xiao-ming (王曉明), LI Guang (李 光), GAO Su-he (高素荷)

        1 School of Mechanical Electronic and Industrial Engineering, University of Electronic Science and Technology of China, Chengdu 611731, China 2 Taiyuan Heavy Industry Co., Ltd., Taiyuan 030024, China

        Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data

        HU Tian-song (胡天松)1*, HUANG Hong-zhong (黃洪鐘)1, WANG Xiao-ming (王曉明)2, LI Guang (李 光)2, GAO Su-he (高素荷)2

        1SchoolofMechanicalElectronicandIndustrialEngineering,UniversityofElectronicScienceandTechnologyofChina,Chengdu611731,China2TaiyuanHeavyIndustryCo.,Ltd.,Taiyuan030024,China

        In the design of large mining excavator electrical system, a practical reliability allocation method was introduced to allocate system level reliability requirements into subsystem and component levels. During the reliability allocation process, factors from the fault and maintenance data were only considered in reliability allocation scheme. It could avoid the disturbance from expert experiences. The entropy method was also used to obtain weights of reliability allocation indexes of large mining excavators considering different factors. Then the failure rate allocation of subsystems and components could be completed.

        reliabilityallocation;largeminingexcavators;theentropymethod

        Introduction

        As a kind of important engineering machineries, the large mining excavator obtains a lot of attentions recently. It is important for the users to enjoy excellent product qualities which should have long service life, low maintenance frequency, and high work efficiency. The reliability allocation can be a powerful method for the above characteristics[1].

        Reliability allocation is utilized to improve the system reliability and can affect the competitiveness of product finally[2]. Using reliability allocation, the task reliability index of system is distributed to subsystems according to the allocation method. It is a decomposition process which is from global to local, from large to small, and from top to bottom[3]. Reliability based design optimization problems may be non-deterministic polynomial (NP)-hard[4]. Finding efficient optimization algorithms is one of the most popular research fields[5]. During recent several decades, many researches about the above problem have been done and published[6-9].

        However,using reliability allocation, the uncertainties of quantitative weights of influencing factors are not considered efficiently, which mainly come from the expert scorings. The human factors of expert evaluation bring these uncertainties to the reliability allocation. In this paper, we utilize the influencing factors of reliability allocation which comes from the failure data to do the index assignment. Then the weight of allocation indexes can be obtained to complete the reliability allocation based on the entropy method[10-11]finally.

        1 Reliability Allocation Model

        To utilize the reliability allocation, both the system reliability allocation task index and allocated objects should be known. The reliability allocation model is also needed to be established.

        The values of allocation indexes should be determined according to the practical engineering. If the value of index is too small, and the system reliability level is too low, the design solutions can not meet the design requirements. If the value of index is too large, the design solutions may be hard to obtain or will result in high economic price. Therefore, the reliability index values are determined by the system reliability prediction and design experts experience.

        For the electrical system of large mining excavator, its reliability function of the system is exponentially distributed, and the mean time between failure (MTBF) is about 100 h. So we can select 200 h as the reliability allocation index of the improved system. Then the improved system reliabilityRs(t) and failure rateλsare shown as

        (1)

        Based on the analysis of failure mode effects and criticality analysis (FMECA) and failure tree analysis (FTA) of the excavator electric system, we decompose the key system into six subsystems: power system, rectifier and feedback system, (PLC) system, frequency converted driving system, comprehensive monitoring system, and auxiliary system. Considering key subsystems as the reliability allocation objects, (upper and lower control system is not key subsystem, not for reliability allocation) the reliability allocation model is established which is shown in Fig.1.

        Fig.1 The reliability allocation model of the excavator electrical system

        2 Analysis of Failure and Maintainance Data

        Here, we use the statistic method to analysis the historical failure and maintenance data. Based on the reliability allocation information from the failure data, two appropriate influencing factors are selected to calculate the allocation weight of electrical subsystems.

        1) The failure frequency factor

        Itis easy to extract statistic information of the failure frequency of subsystems and components from the actual failure data as the mean time to repair (MTTR). Selecting the failure frequency of subsystems as the basis of distribution, the reliability allocation influencing factor can be obtained as

        (2)

        whereENiis the failure frequency factor of theith subsystem, and if its value is greater, the subsystem failure is more frequent;NiandNjare the failure times of theith and thejth subsystems;Nsis the total failure times of system, which is the sum of subsystems failure times;nis the number of subsystems or components in reliability allocation.

        2) The MTTR factor

        Selecting the MTTR of subsystems as the basis of distribution, the reliability allocation influencing factor can be obtained as

        (3)

        whereETiis the MTTR factor of theith subsystem, and if its value is greater, the subsystem MTTR is longer;TiandTjare the MTTR of theith and thejth subsystems;Tsis the total MTTR of system, which is the sum of subsystems MTTR;nis the number of subsystems or components in reliability allocation.

        3) The allocation factor calculation

        Based on universal criteria of reliability allocation, the reliability allocation factor should be positively correlated because of the failure frequency and MTTR factors. The improvements of reliability and the reductions of failure frequency are needed if the failures of subsystems appear frequently. Thus the allocation factor should be larger. If the MTTR of subsystem is longer, it also needs to reduce its frequency of repair, improve the availability. Thus its allocation factor should be larger.

        Series system reliability allocation index is negatively correlated to the allocation factorWias shown in Fig.2. In order to meet the reliability allocation criteria, the reliability allocation factor of series system can be defined respectively as

        (4)

        Fig.2 The reliability allocation model of the series system

        whereWiis the allocation factor ofith subsystem;EiandEjare the influencing factors of theith and thejth subsystems, and it can beENiorETi, respectively;nis the number of subsystems or components in reliability allocation.

        4) The analysis results

        After collecting the excavator failure data during 2012, the failure frequency and MTTR of electrical subsystems can be clearly described in Figs. 3 and 4.

        Fig.3 The failure frequency of the excavator electrical subsystems

        Fig.4 The MTTR of the excavator electrical subsystems

        Based on the failure data statistics, the reliability influencing factors of each key subsystem can be obtained using the reliability allocation factor formula of series system in Eq. (4). The values of reliability influencing factors are shown in Tables 1 and 2.

        Table 1 The reliability allocation factors based on failure frequency

        Table 2 The reliability allocation factors based on MTTR

        3 The Reliability Allocation Using the Entropy Method

        1) The entropy method

        Considering different influencing factors of the failure data, two different allocation factors are used. However, it results in two different allocation results of electrical subsystems. To solve the above problem, entropy method can be used to have the weight transform of two allocation factors.

        Information entropy can measure the amount of useful information according to the provided data. On one hand, when the value difference between the evaluating objects on the same indicator is high and the entropy is small, it means that this indicator provides more useful information and the weight of this indicator should be set correspondingly higher. On the other hand, if the difference is smaller and the entropy is higher, the relative weight would be smaller. By calculating the entropy, the best indicators which reflect different dispersion levels among monitoring points can be choosing as the weights.

        In the evaluating objectWij, which hasmindicators, the entropy of theith indicator is defined as

        (5)

        The weight of entropy of thejth indicator could be defined as:

        (6)

        wheredj=1-Hj.

        For reliability allocation factors in Tables 1 and 2, using the entropy method, the new allocation factors are obtained as shown in Table 3.

        2) The reliability allocation results

        For the electrical system of large mining excavator, its reliability function of the system is exponentially distributed, and MTBF (200 h) is the reliability allocation index. With the reliability allocation factors solved, the electrical subsystems reliability indexes are described as

        (7)

        AndTi(MTBF of each subsystem) can be obtained as

        Ti=1/λi=1/λsWi=200/Wi.

        (8)

        Then the final reliability allocation indexes are shown in Table 4.

        Table 3 The reliability allocation factors using the entropy method

        Table 4 The reliability allocation indexes of electrical subsystems

        4 Conclusions

        The reliability allocation of the electrical system of large mining excavator is important to improve the system reliability. The frequency converted driving system and the auxiliary system are the prior and critical systems for system failure. In this paper, the entropy method is introduced to determine weights of allocation factors, considering two kinds of reliability factors. This method can avoid involving the subjective factor effectively. Thus the allocation results using the entropy method are more reasonable and reliable.

        [1] Mettas A. Reliability Aallocation and Optimization for Complex Systems [C]. Proceedings of Annual IEEE of Reliability and Maintainability Symposium, Los Angeles, CA, USA, 2000: 216-221.

        [2] Chang Y C, Chang K H, Liaw C S. Innovative Reliability Allocation Using the Maximal Entropy Ordered Weighted Averaging Method [J].Computers&IndustrialEngineering, 2009, 57(4): 1274-1281.

        [3] Zhang X G, Wu X Y. Advances in System Reliability Allocation [J].FireControl&CommandControl, 2012, 37(8): 1-4.(in Chinese)

        [4] Chen L L, Yu J. Optimal Distribution of Reliability for a Large Network Based on Connectivity [J].AppliedMathematicsandMechanics, 2008, 29(12): 1633-1642.

        [5] Zhi W G, Guang B C. Reliability Allocation Using Analytical Target Cascading Method [C]. The 16th International Conference on IEEE Industrial Engineering and Engineering Management, Beijing, China, 2009: 1195-1199.

        [6] Berman O, Ashrafi N. Optimization Models for Reliability of Modular Software Systems [J].IEEETransactionsonSoftwareEngineering, 1993, 19(11): 1119-1123.

        [7] Zahedi F, Ashrafi N. Software Reliability Allocation Based on Structure, Utility, Price, and Cost [J].IEEETransactionsonSoftwareEngineering, 1991, 17(4): 345-356.

        [8] Wang Y Q, Yam R C M, Zuo M J,etal. A Comprehensive Reliability Allocation Method for Design of CNC Lathes [J].ReliabilityEngineering&SystemSafety, 2001, 72(3): 247-252.

        [9] Huang H Z. The Fuzzy Method for the Reliability Apportionment of the Mechanical System [J].JournalofMechanicalScienceandTechnology, 1996, 15(2): 182-186.

        [10] Xie C, Zhong Z. Entropy Method and Its Application in Comprehensive Evaluation of Bank’s Performance [J].ChinaSoftScience, 2002(9): 108-110.(in Chinese)

        [11] Zou Z H, Yun Y, Sun J N. Entropy Method for Determination of Weight of Evaluating Indicators in Fuzzy Synthetic Evaluation for Water Quality Assessment [J].JournalofEnvironmentalSciences, 2006, 18(5): 1020-1023.

        Foundation item: National High-Tech Research and Development Program (863 Program), China (No. 2012AA062001)

        1672-5220(2014)06-0779-03

        Received date: 2014-08-08

        * Correspondence should be addressed to HU Tian-song, E-mail: wu235813235813@163.com

        CLC number: TB114.3 Document code: A

        猜你喜歡
        胡天王曉明
        胡天妮:種小麥應(yīng)用智能噴灌設(shè)施節(jié)水50%
        Solar broadband metamaterial perfect absorber based on dielectric resonant structure of Ge cone array and InAs film*
        Order Allocation in Industrial Internet Platform for Textile and Clothing
        Analysis of secondary electron emission using the fractal method*
        糖夢
        胡天成教授治療小兒厭食癥經(jīng)驗擷菁
        一口獨吞
        小青蛙報(2014年14期)2014-12-17 21:13:24
        Generation and evolution characteristics of the mushroom-like vortex generated by a submerged round laminar jet*
        砸呀砸
        誰最笨
        小青蛙報(2009年12期)2009-05-11 03:59:46
        女女互揉吃奶揉到高潮视频| 口爆吞精美臀国产在线| 亚洲中文字幕乱码第一页| 蜜臀精品一区二区三区| 所有视频在线观看免费| √天堂资源中文www| 成人aaa片一区国产精品| 国产精品igao视频网| 国产精品亚洲A∨天堂不卡| 亚洲av一区二区网址| 永久中文字幕av在线免费| 午夜被窝精品国产亚洲av香蕉 | 久久精品国产亚洲av瑜伽| 中文字幕一区二区三区在线视频| 永久免费看黄在线观看| 久久无码高潮喷水抽搐| 无码av免费一区二区三区试看| 91情侣视频| 精品中文字幕日本久久久| 国产一区二区三区四区在线视频| 精品露脸国产偷人在视频| 日日av拍夜夜添久久免费| 亚洲成AV人在线观看网址| 一级a免费高清免在线| 日韩欧美中文字幕公布 | 国产成人国产在线观看入口| 极品诱惑一区二区三区| 中文字幕日本av网站| 中国精品18videosex性中国| 激情97综合亚洲色婷婷五| 精品熟女少妇免费久久| 女同国产日韩精品在线| 国产精品久久久三级18| 国产麻豆精品一区二区三区v视界 妺妺窝人体色www看美女 | av高清视频在线麻豆免费观看| 伊人久久精品无码av一区| 97精品一区二区视频在线观看| 亚洲AV无码资源在线观看| 久久开心婷婷综合中文| 日本视频二区在线观看| 亚洲国产av玩弄放荡人妇系列|