亚洲免费av电影一区二区三区,日韩爱爱视频,51精品视频一区二区三区,91视频爱爱,日韩欧美在线播放视频,中文字幕少妇AV,亚洲电影中文字幕,久久久久亚洲av成人网址,久久综合视频网站,国产在线不卡免费播放

        ?

        Interval Fault Tree Analysis of Excavator Variable-Frequency Speed Control System

        2014-08-12 02:31:00WANGXiaoming王曉明LIAifeng李愛(ài)峰ZHANGYongming張永明MIJinhua米金華HUANGHongzhong黃洪鐘
        關(guān)鍵詞:王曉明金華

        WANG Xiao-ming (王曉明), LI Ai-feng (李愛(ài)峰), ZHANG Yong-ming (張永明), MI Jin-hua (米金華), HUANG Hong-zhong (黃洪鐘)

        1 Taiyuan Heavy Industry Co., Ltd., Taiyuan 030024, China 2 School of Mechanical Electronic and Industrial Engineering, University of Electronic Science and Technology of China, Chengdu 611731, China

        Interval Fault Tree Analysis of Excavator Variable-Frequency Speed Control System

        WANG Xiao-ming (王曉明)1*, LI Ai-feng (李愛(ài)峰)1, ZHANG Yong-ming (張永明)1, MI Jin-hua (米金華)2, HUANG Hong-zhong (黃洪鐘)2

        1TaiyuanHeavyIndustryCo.,Ltd.,Taiyuan030024,China2SchoolofMechanicalElectronicandIndustrialEngineering,UniversityofElectronicScienceandTechnologyofChina,Chengdu611731,China

        In consideration of the uncertainty of basic events failure rate and lack of probability statistical information in fault tree analysis (FTA) of excavator variable-frequency speed control system, the interval theory was employed and combined with conventional FTA method. The basic events failure probabilities were described by interval numbers, and the interval operators of logical gates in FTA were deduced based on interval theory. Finally, the reliability assessment of excavator variable-frequency speed control system was done by interval FTA method. The result shows that the interval FTA method is suitable for the complex system with insufficient failure data.

        faulttreeanalysis(FTA);intervaltheory;intervalprobability;excavator;electricalsytem

        Introduction

        The large mining excavator is produced as mining equipment for large open pit mine. After nearly five decades of development, the main bucket capacity of products is from 10 m3to 75 m3. It has turned into the main mining equipment of the million-ton large-scale open mines. As the main core control system of excavator, the reliability of electric system and its subsystem like variable-frequency speed control system, directly affect the efficiency of the whole excavator[1-2].

        Fault tree analysis (FTA) method is a systematic deductive and graphical method, and widely used in reliability analysis and assessment for complex system.The uncertainty of whole system failure can be measured by probability theory; therefore, the traditional fault tree analysis method based on probability has been proved to be very useful and commonly used in system engineering as a system analysis method[3-7].

        Due to lack of information and sufficient data, especially when the failure probability of a large complex system is estimated, considering the uncertainty of estimated value, the failure probability is always treated as a random variable subject to a known distribution. There are various research works on the reliability problem with uncertain input data, for instance, fuzzy fault tree analysis method based on fuzzy theory[3-4], and interval fault tree analysis method based on Dempster-Shafer (D-S) evidential theory[5-7].

        In this paper, considering the uncertainty of bottom events of fault tree, the occurrence probabilities of bottom events are expressed as interval numbers. The interval theory are employed and combined with conventional FTA method to analyze the reliability of excavator variable-frequency speed control system. The remainder of this paper is organized as follows: the excavator variable-frequency speed control system is briefly introduced in Section 1. The fault tree model is constructed by conventional FTA method. Section 2 reviews the interval theory and proposes interval operator of logical gates in FTA. The detail reliability analysis of variable-frequency speed control system is also presented in this section. Section 3 concludes this paper.

        1 Fault Tree Modeling of Excavator Variable-Frequency Speed Control System

        1.1 Variable-frequency speed control system

        The operating mechanism of large mining excavator can be divided into five parts based on its different functions,i.e., lifting mechanism, travelling mechanism, crowding mechanism, swing mechanism, and bucket open mechanism. The variable frequency and speed regulation electric system is used to control and coordinate the actions of operating mechanisms. The working principle of a kind of common used variable-frequency speed control systems is shown in Fig.1.

        Fig.1 Working principle of variable-frequency speed control system of WK series large excavators

        In order to regulate the speed smoothly, the direct current (DC) power with stable voltage is transferred into an alternating current (AC) power with adjustable voltage and frequency by the inverter mounted on a common DC bus. Lifting mechanism is driven by two rigidly-connected motors with consistent speed, and driven by two inverters respectively. A master-slave torque controlling method is applied to realizing the output equilibrium of two lifting motors. The crowding mechanism is driven by a single AC variable-frequency motor which is controlled by an inverter cabinet, and swing mechanism has two geared variable-frequency motors driven by one inverter. Especially, the two motors of travelling mechanism are also driven by two independent inverters which are shared with lifting mechanism, and working patterns switch between lifting and travelling are performed by an AC contactor in switching cabinet, which is clearly shown in Fig.1.

        1.2 Fault tree construction

        On the basis of previous work in the failure mode and effects analysis (FMEA) results of the entire electrical system, the “operating mechanism variable-frequency speed control system failure” is chosen as the top event. According to the rules of building fault trees, the failure models of whole system are composed of those four mainly failures, including motors damage, inverters failure, encoder doesn’t work and brake. Then taking the components and parts failure models as the bottom events, the fault tree of variable-frequency speed control system is built and shown in Fig.2.

        Fig.2 The fault tree of variable-frequency speed control system

        The meanings of the notations in Fig.2 are as follows:T: operating mechanism variable-frequency speed control system failure;G1: lifting mechanism failure;G2: travelling mechanism failure;G3: crowding mechanism failure;G4: swing mechanism failure;X1: front lifting inverter 1 failure;X2: front lifting motorM11failure;X3: encoder 1 of front lifting motor failure;X4: lifting brake;X5: back lifting inverter 2 failure;X6: back lifting motorM12failure;X7: encoder 2 of back lifting motor failure;X8: switch cabinet failure;X9: left travelling motorM21failure;X10: encoder 3 of left travelling motor failure;X11: travelling brake;X12: right travelling motorM22failure;X13: encoder 4 of right travelling motor failure;X14: crowd inverter 3 failure;X15: crowding motorM3failure;X16: encoder 5 of crowding motor failure;X17: swing inverter failure;X18: front-left swing motorM41failure;X19: encoder 6 of swing motor failure;X20: front-right swing motorM42failure;X21: back swing motor failureM43failure;X22: swing reactor failure;X23: bucket opening motor failure. In the following parts, usexi(i=1, 2, …, 23) to represent the random variables of eventsXi.

        Because of the insufficient of data, the precise probabilities of bottom events cannot be obtained, so the conventional quantitative analysis method is out of use. In this paper, by looking up the handbook of mechanical design [8], as well as integrating the knowledge of various relevant experts, the failure probabilities of bottom events are determined by using the following method. Iftis set to 200 h and taking 10 percent of the deviation of the expected value as the upper and lower bounds, the interval failure probabilities of bottom events are tabulated in Table 1.

        Table 1 Bottom events and interval failure probability

        Note: Prob. means probability

        2 Reliability Analysis of Excavator Variable-Frequency Speed Control System

        2.1 The structure function of fault tree

        Assume that the system and its components are all binary, and the faults between various components are independent. For the fault tree of variable-frequency speed control system, it hasn=23 bottom events and the top event isT. According to the basic definition of fault tree, the state variable of top eventΦcan be expressed as a function of state variables of bottom eventsxi(i= 1, 2, …,n), that is:

        (1)

        2.2 FTA based on interval theory

        (1) Interval operator of AND gate

        (2)

        (2) Interval operator of OR gate

        (3)

        (4)

        (5)

        The output probability of AND and OR gates withnbottom events can be calculated, accordingly, using the interval method to analyze the fault tree and the failure probability of top events can be calculated.

        The importance of the components in system not only depends on its physical structure but its reliability. The importance of interval probability of the top event can be defined as:

        (6)

        where [F]iis the interval probability of basic eventxi, and [g(F)] is the interval failure probability function of the top event.

        2.3 Qualitative and quantitative analyses of fault tree

        In order to find the cut set of a fault tree, which is the smallest combination of basic events that directly lead to system failure, the Fussell-Vesely method and Semanderes method are the most common used methods for seeking fault tree minimal cut sets[9]. In this paper, the Semanderes method which is based on the sets operation rules, is chosen to find minimal cut sets of the fault tree of variable-frequency speed control system.

        The bottom level of fault tree is given by:

        G1=x1∪x2∪x3∪x4∪x5∪x6∪x7∪x8,

        G2=x1∪x2∪x8∪x9∪x10∪x11∪x12∪x13,

        G3=x14∪x15∪x16,

        G4=x17∪x18∪x19∪x20∪x21∪x22.

        And the top level is expressed as:

        M4=G1∪G2∪G3∪G4∪x23=

        (x1∪x2∪x3∪x4∪x5∪x6∪x7∪x8)∪

        (x1∪x2∪x8∪x9∪x10∪x11∪x12∪x13)∪

        (x14∪x15∪x16)∪x23∪

        (x17∪x18∪x19∪x20∪x21∪x22)=

        x1∪x2∪…∪x23

        (7)

        There are 23 product terms in Eq. (7), and we finally find 23 minimal cut sets of variable-frequency speed control system: {x1}, {x2}, …, {x23}.

        The interval probability of basic event is [F]xi, according to Eq.(3) the definition of interval operator of OR gate and the qualitative analysis of fault tree, the failure probability of middle events and top event are given by:

        And the minimal cut sets are independent, the failure probability of top event is:

        (8)

        According to the parameters listed in Table 1, the following failure probability of top event att=200 h can be obtained:

        [F]T=[0.4899, 0.5633].

        The fauilre rate of variable-frequency speed control system isλs=[3366, 4143]×10-6. Since the interval probability of top event cannot directly reflect in the distribution of the failure rate. The sampling simulation method is used to do random simulation on interval failure probabilities of basic events. After 1 000 times of independent sampling and simulation, the failure rate distribution of top event on fault interval is shown in Fig.3. It is obviously that the simulation result is consistent with the theoretical result.

        Fig.3 The failure rate distribution on fault interval

        According to Eq. (6) and the algorithm of the interval number, the probability importance of the bottom event can be computed by the proposed method, and the results are listed in Table 2.

        Table 2 The probability importance factor of bottom events

        Ig(11) ≥Ig(4)≥Ig(23)≥Ig(17)≥Ig(1)≥Ig(5)≥Ig(14)≥Ig(15)≥Ig(22)≥Ig(18)≥Ig(20)≥Ig(21)≥
        Ig(2)≥Ig(6)≥Ig(8)≥Ig(12)≥Ig(9)≥Ig(3)≥
        Ig(7)≥Ig(16)≥Ig(13)≥Ig(10)≥Ig(19).

        3 Conclusions

        Because of the lack of information and insufficient failure data of the basic events are available, the uncertainty is introduced in the FTA of complex system. In this paper, the interval theory is employed and combined with conventional FTA method, using interval number rather than a precise value to represent the occurrence probabilities of bottom events. The interval operators of logical gates of FTA are deduced. The interval FTA method is used to estimate the reliability of excavator variable-frequency speed system. The NSG ranking method is used to sort the interval importance of basic events, and this result is able to provide a reasonable guidance for fault diagnosis and maintenance of excavator variable-frequency speed system. The study in this paper shows that the interval FTA method is suitable for the reliability analysis of complex system with insufficient failure data.

        [1] Miao G C, Liu X X. Electric Failure Types and Self-diagnosis System of WK-35 Power Shovel[J].MechanicalEngineering&Automation, 2010, 163(6): 125-127. (in Chinese)

        [2] Miao G C. The Variable-Frequency Speed Control Electrical System of WK Series Large Excavator[J].OpencastMiningTechnology, 2012(4): 34-38.(in Chinese)

        [3] Li Y F, Huang H Z, Liu Y,etal. A New Fault Tree Analysis Method: Fuzzy Dynamic Fault Tree Analysis[J].EksploatacjaiNiezawodnosc-MaintenanceandReliability, 2012, 14(3): 208-214.

        [4] Mi J H, Li Y F, Li H Q,etal. Reliability Analysis of CNC Hydraulic System Based on Fuzzy Fault Tree[C]. 2011 International Conference on IEEE Quality, Reliability, Risk, Maintenance, and Safety Engineering, Xi’an, 2011: 208-212.

        [5] Nan H, Liu Y S, Zhang F,etal. Fault Tree Analysis of Bleed Air Anti-icing Pipeline System Based on Interval Analysis Method[J].AeronaiuticalComputingTechnique, 2013, 43(3): 48-51. (in Chinese)

        [6] Carreras C, Walker I D. Interval Methods for Fault-Tree Analysis in Robotics[J].IEEETransactionsonReliability, 2001, 50(1): 3-11.

        [7] Zhang X F, Zhao Y, Shi H L. Fault Tree Interval Analysis Using D-S Theory[J].MechanicalScienceandTechnologyforAerospaceEngineering, 2007, 26(5): 659-661. (in Chinese)

        [8] Chen D. Handbook of Mechanical Design [M]. 4th ed. Beijing: Chemical Industry Press, 2002. (in Chinese)

        [9] Liu H Z, Zhang L, Wang Y Q,etal. One Advanced Calculation Method for the Least Cut Set and Least Path Set of Fault Tree[J].IndustrialSafetyandEnvironmentProtection, 2006, 32(4): 58-59. (in Chinese)

        [10] Sun H L, Yao W X. Comments on Methods for Ranking Interval Number[J].JournalofSystemEngineering, 2010, 25(3): 304-312. (in Chinese)

        [11] Nakahara Y, Sasaki M, Gen M. On the Linear Programming Problems with Interval Coefficients[J].InternationalJournalofComputerIndustrialEngineering, 1992, 23(1/2/3/4): 301-304.

        Foundation item: National High-Tech Research and Development Program (863 Program), China (No. 2012AA062001)

        1672-5220(2014)06-0763-03

        Received date: 2014-08-08

        * Correspondence should be addressed to WANG Xiao-ming, E-mail: 13007082113@163.com

        CLC number: TD422 Document code: A

        猜你喜歡
        王曉明金華
        張金華
        大江南北(2022年11期)2022-11-08 12:04:18
        歲朝清供
        寶藏(2021年1期)2021-03-10 11:06:18
        陳金華
        紅氣球請(qǐng)客
        蜘蛛王要“吃”藍(lán)臉兔
        糖夢(mèng)
        金華地區(qū)籽蓮無(wú)公害栽培技術(shù)
        一口獨(dú)吞
        砸呀砸
        誰(shuí)最笨
        亚洲av久久无码精品九九 | 日韩女优一区二区在线观看| 一二三区亚洲av偷拍| 国产免码va在线观看免费| 国产无套内射久久久国产| 最近中文av字幕在线中文| 亚洲国产AⅤ精品一区二区久| 亚洲一区二区三区1区2区| 青青草国产手机观看视频| 国产午夜手机精彩视频| 国产suv精品一区二人妻| 人妖精品视频在线观看| 久久国产精品懂色av| 亚洲国产av一区二区三区精品| 亚洲va欧美va日韩va成人网| 亚洲欧美日韩中文在线制服| 一区二区在线亚洲av蜜桃| 亚洲综合偷拍一区二区| 久久国内精品自在自线| 亚洲国产精品久久人人爱| 国产成人精品三级麻豆| 国产美女自拍国语对白| 漂亮人妻出轨中文字幕| 又紧又大又爽精品一区二区| 国产99久久久久久免费看| 中文字幕无码免费久久9一区9| 国产av大片久久中文字幕| 久久久精品视频网站在线观看| 欧美一性一乱一交一视频| 成年男女免费视频网站| 亚洲二区三区在线播放| 日本乱码一区二区三区在线观看| 国产v片在线播放免费无码| 亚洲va中文字幕无码久久不卡| 欧美精品一本久久男人的天堂 | 中文字幕一区二区三区乱码人妻| 亚洲熟妇色自偷自拍另类| 欧美尺寸又黑又粗又长| 深夜福利国产| 大陆少妇一区二区三区 | 亚洲人成网7777777国产|