亚洲免费av电影一区二区三区,日韩爱爱视频,51精品视频一区二区三区,91视频爱爱,日韩欧美在线播放视频,中文字幕少妇AV,亚洲电影中文字幕,久久久久亚洲av成人网址,久久综合视频网站,国产在线不卡免费播放

        ?

        海登大道3535 號(hào)美國(guó)加利福尼亞州卡爾弗市

        2021-03-04 03:15:56湯姆·邦納
        世界建筑導(dǎo)報(bào) 2021年1期
        關(guān)鍵詞:建筑

        設(shè)計(jì)單位:埃里克·歐文·莫斯建筑師事務(wù)所

        項(xiàng)目類型:辦公

        建筑面積:53 000平方呎

        時(shí)間: 1997年

        獲獎(jiǎng):CC/AIA設(shè)計(jì)獎(jiǎng),1998年;AIA/LA設(shè)計(jì)優(yōu)秀獎(jiǎng),1997年

        攝影:湯姆·邦納

        Architect: Eric Owen Moss Architects

        Program: Office

        Building Area (Square Feet): 53 000sf

        Year: 1997

        Awards: CC/AIA Design Award, 1998; AIA/LA Design Merit Award, 1997

        Photography: Tom Bonner

        3535海登大道項(xiàng)目是一家高知名度的國(guó)際平面設(shè)計(jì)和媒體公司的總部所在地。公司為多個(gè)客戶提供服務(wù),這些客戶經(jīng)常競(jìng)爭(zhēng)同一個(gè)項(xiàng)目,所以公司必須在工作于該建筑內(nèi)各項(xiàng)目團(tuán)隊(duì)之間保持分立狀態(tài)。

        這是一個(gè)四層鋼架結(jié)構(gòu)的新建筑,由現(xiàn)場(chǎng)舊倉庫剩余的木柱子和桁架建造而成。除了保留柱子和大跨度弓弦桁架結(jié)構(gòu)外,其余均被拆除。新的鋼管柱和寬翼緣梁被放置在原來的桁架和柱子的上、下、周圍,因此竣工結(jié)論是兩種不同的建筑風(fēng)格在空間上的融合,這在同一棟建筑中很少出現(xiàn)。

        木結(jié)構(gòu)系統(tǒng)不再起作用——它只支持自身——除了沿北立面的最后一個(gè)結(jié)構(gòu)開間,在那里,原倉庫的一半拱形桁架支撐屋頂保留在新的平面設(shè)計(jì)空間上。原弓弦桁架中心的木柱支撐跨越倉庫隔間,現(xiàn)在確定了主要公共流通走廊的中心線,從中央大廳開始,貫穿大樓的東,西兩個(gè)方向。

        改造后的原舊桁架的不完整頂弦穿過面向停車場(chǎng)的南墻,并用于支撐一個(gè)新的鋼角,太陽控制系統(tǒng)用來保護(hù)南墻窗戶。在南側(cè)的入口上方,仍留有僅存的一個(gè)完整桁架,它朝向停車場(chǎng),來標(biāo)志著入口門。在門的上方是一個(gè)傾斜的,懸挑的正交建筑,其中包含一個(gè)三樓會(huì)議室。建筑大堂是一個(gè)三層的圓錐形體積,有東西延伸的循環(huán)走廊。一個(gè)開放式的樓梯環(huán)繞著西側(cè)的大廳。二層和三層的橋梁橫跨大堂,連接電梯核心和樓層區(qū)域。接待處后面是主要的會(huì)議空間,在一樓被封閉,二樓的玻璃幕墻與大廳上方的二層橋相連。從二樓和三樓大廳橋上可以看到會(huì)議室的活動(dòng)。四樓為行政樓層,由三樓的天花板封閉,可乘坐電梯進(jìn)入下面的大堂。

        彎曲的鋼梁和內(nèi)部大廳的錐形延伸,通過建筑的南面立面,支撐著入口上方的鋼頂棚。頂部由兩根彎曲的梁支撐,穿過兩個(gè)延伸到入口區(qū)域的木桁架。

        第一層、第二層和第三層包含辦公室,制作,圖書館和計(jì)算機(jī)空間。一樓是一間廚房,以及一個(gè)室內(nèi)和室外的用餐區(qū),其中包括建筑東端的一個(gè)有圍墻的景觀花園。

        The 3535 Hayden Avenue project houses the headquarters for a high profile, international graphic design and media company.The firm serves multiple clients who are often competing for the same projects, and must maintain separation between the operations of discrete project teams at work in the building.

        The building is a new, four story steel frame structure constructed over the remaining wood posts and trusses from an old warehouse on the site.The original building was demolished except for the posts and long span bow string truss structure, which was preserved.The new steel tube columns and wide flange beams are positioned over, under, around, and through the original trusses and posts, so that the built conclusion is a spatial amalgamation of two distinct construction types rarely found together in a single building.

        The wood structure system is no longer functional - it supports only itself - with the exception of the last structural bay along the north elevation, where half the vaulted, truss supported roof of the original warehouse is preserved over the new graphic design space.The wood post supports at the center of the original bow-string truss spanning warehouse bays now define the center line of the primary public circulation hallway, running the length of the building, east and west from the central lobby.

        The incomplete top chords of the modified original old trusses project through the south wall facing the parking, and are used to support a new steel angle, sun control system to protect the south wall windows.Over the entrance on the south side the only remaining completed truss remains, projecting into the parking lot to mark the entry doors.Above the doors is an inclined,cantilevering orthogonal block that contains a third floor conference room.

        The building lobby is a three story, conical volume with circulation corridors extending east and west.An open stair encircles the lobby on the west side.Bridges on levels two and three span the lobby, connecting the elevator core with the floor areas.Behind the reception desk is the primary conference space, enclosed at the ground level, and glazed on the second floor wall adjoining the second level bridge over the lobby.Events in the conference room are visible from the second and third floor lobby bridges.The fourth floor is an executive floor, closed by the third floor ceiling from the lobby below, accessible by elevator.

        The curving steel beams and that form the interior lobby cone extend out, through the south elevation of the building, to support a steel canopy over the entrance.The canopy, endsupported by the two curving beams, passes through two of the wood trusses that also extend over the entry area.

        實(shí)體模型 Entity model

        軸測(cè)圖 Axon

        Floors one, two, and three contain a mixture of office,production, library, and computer spaces.On the ground floor is a kitchen, and an indoor and outdoor dining area that includes a walled, landscaped garden on the east end of the building.

        猜你喜歡
        建筑
        《北方建筑》征稿簡(jiǎn)則
        北方建筑(2021年6期)2021-12-31 03:03:54
        關(guān)于建筑的非專業(yè)遐思
        文苑(2020年10期)2020-11-07 03:15:36
        建筑的“芯”
        山居中的石建筑
        廢棄建筑
        高一帆
        藝術(shù)家(2017年3期)2018-01-26 08:54:49
        《老建筑》
        聽,建筑在訴說
        獨(dú)特而偉大的建筑
        超高層建筑可以休矣
        中文区中文字幕免费看| 五码人妻少妇久久五码| 日本免费三片在线视频| 天天干天天日夜夜操| 欧美日韩视频在线第一区 | 亚洲天堂免费视频| 综合久久青青草免费观看视频| 日本一二三四高清在线| 免费毛片a线观看| 久久久久久久久久久熟女AV| 精品蜜桃一区二区三区| 国产精品亚洲三级一区二区三区| 免费a级毛片18以上观看精品| 人妻无码中文人妻有码| 国产不卡一区在线视频| 亚洲一区二区三区四区地址| 国产成人亚洲精品青草天美 | 人妻aⅴ无码一区二区三区| 国语精品视频在线观看不卡| 99久久国产免费观看精品| 国产国产人免费人成免费视频 | 国产一区二区三区av免费| 欧美牲交a欧美牲交aⅴ免费真| 日韩中文字幕欧美亚洲第一区| 亚洲一级av大片在线观看| 产美女被爽到高潮免费a| 亚洲精品乱码久久久久久金桔影视| 免费在线视频一区| 国产一级自拍av播放| 国产成人无码一区二区三区| 麻豆亚洲av永久无码精品久久| 无码超乳爆乳中文字幕| 国产精品一区二区韩国av| 国产熟妇另类久久久久| 亚洲欧美欧美一区二区三区| 一区二区三区在线视频爽| 精品无人区无码乱码毛片国产 | 国产精品永久在线观看| 女人做爰高潮呻吟17分钟| 麻豆av一区二区天堂| 国产色视频一区二区三区不卡|