王培濤
摘? 要:伴隨我國(guó)社會(huì)經(jīng)濟(jì)的飛速發(fā)展,總體用電量也在愈發(fā)增大,而在此背景下電站也隨之獲得了良好的發(fā)展,在電站電氣安裝施工期間受到諸多因素的影響,會(huì)致使在施工期間產(chǎn)生不少的問(wèn)題,這會(huì)嚴(yán)重影響到電站電氣安裝施工的質(zhì)量,更甚會(huì)造成其他安全方面的問(wèn)題。對(duì)此,就務(wù)必要探析電氣安裝施工中存在問(wèn)題的產(chǎn)生原因,而后提前制定好預(yù)防的措施,以在最大程度上控制安裝施工期間的問(wèn)題產(chǎn)生,以期真正保障電站電氣安裝施工的質(zhì)量。文章以電站電氣設(shè)備安裝的重要性分析為出發(fā)點(diǎn),而后探討了電站電氣安裝施工中存在的問(wèn)題,最后對(duì)電站電氣安裝施工中問(wèn)題的預(yù)防措施進(jìn)行了一定探討。
關(guān)鍵詞:變電站;電氣;安裝施工;問(wèn)題;預(yù)防措施
中圖分類(lèi)號(hào):TM63 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):2095-2945(2020)21-0134-02
Abstract: Along with the rapid development of social economy in our country, the overall power consumption are also increasingly enlarged, and in the context, the power plant has obtained the good development. During the installation of power plant construction, many factors caused a lot of problems, which will seriously affect the quality of the installation of power plant construction, and will cause other security issues. In this regard, it is necessary to analyze the causes of the problems in the electrical installation and construction, and then formulate preventive measures in advance, in order to control the problems during the installation and construction to the greatest extent, and ensure the quality of the electrical installation and construction of the power station. Based on the analysis of the importance of the installation of electrical equipment in the power station, this paper discusses the problems existing in the electrical installation and construction of the power station, and finally discusses the preventive measures for the problems in the electrical installation and construction of the power station.
Keywords: power station; electricity; installation and construction; problem; preventive measures
前言
為更好的滿足我國(guó)人民日益增長(zhǎng)的用電需求,保障用電的安全性、防范安全事故的產(chǎn)生、保障變電站電氣設(shè)備的施工質(zhì)量顯得愈加重要。隨著我國(guó)設(shè)備安裝技術(shù)的飛速發(fā)展,變電站電氣設(shè)備安裝的質(zhì)量也獲得了明顯的提升,但不可否認(rèn)的是,也會(huì)受到主觀、客觀等層面因素的影響,因此我國(guó)變電站電氣設(shè)備的施工質(zhì)量仍有待提高。本文主要針對(duì)變電站電氣設(shè)備安裝過(guò)程中所存在的問(wèn)題,提出相應(yīng)的預(yù)防措施,以便將問(wèn)題扼殺在萌芽之中,不斷提升變電站電氣安裝施工的整體性質(zhì)量。
1 變電站電氣設(shè)備安裝的重要性
電氣設(shè)備施工質(zhì)量會(huì)對(duì)電氣設(shè)備的使用壽命產(chǎn)生直接性的影響,變電站主要分為室外電氣設(shè)備與室內(nèi)電氣設(shè)備。伴隨我國(guó)信息化技術(shù)的飛速發(fā)展,我國(guó)變電站向智能化的發(fā)展方向前行,而在此情況下保障電氣設(shè)備的施工質(zhì)量則顯得更為關(guān)鍵。具體來(lái)說(shuō)變電站電氣設(shè)備安裝的重要性主要體現(xiàn)在以下幾個(gè)方面:第一,電氣設(shè)備的安裝投入運(yùn)行使變電站變?yōu)橐徽麄€(gè)運(yùn)行體,在建設(shè)變電站的過(guò)程中,還包括土建、消防、通訊等專(zhuān)業(yè),唯有在完成電氣設(shè)備安裝并調(diào)試合格后,才可使其變?yōu)橐粋€(gè)整體[1]。第二,電氣設(shè)備安裝應(yīng)確保變電站在實(shí)際運(yùn)作中的安全性,在進(jìn)行電氣安裝施工的過(guò)程中,應(yīng)針對(duì)于電氣設(shè)備自身的主要特性、安裝圖、施工環(huán)境、施工人員等內(nèi)容制定施工方案,重現(xiàn)制造精度及安裝進(jìn)度,確保電氣設(shè)備的安裝質(zhì)量,保障變電站電氣運(yùn)作的安全性。
2 變電站電氣安裝施工中存在的問(wèn)題
在變電站電氣設(shè)備施工中所存在的問(wèn)題有許多,如配電裝置安裝所產(chǎn)生的問(wèn)題,變壓器安裝所產(chǎn)生的問(wèn)題、電氣二次施工問(wèn)題等。主要包括以下幾點(diǎn):其一,配電裝置安裝時(shí)所產(chǎn)生的問(wèn)題。高壓配電在整個(gè)安裝階段易于產(chǎn)生問(wèn)題,其主要原因是設(shè)備自身存在制造誤差,在現(xiàn)場(chǎng)較差的安裝環(huán)境下,容易受潮、元器件損壞等此類(lèi)的問(wèn)題[2]。另外,在保存、運(yùn)輸、安裝過(guò)程中也容易產(chǎn)生問(wèn)題,舉例來(lái)說(shuō),若在吊裝時(shí)或是裝置裝卸時(shí)產(chǎn)生碰撞,則易于致使設(shè)備遭受損壞。在二次轉(zhuǎn)運(yùn)時(shí)也容易出現(xiàn)此問(wèn)題;對(duì)于設(shè)備存在的孔洞來(lái)說(shuō),若未能予以及時(shí)的封堵,則會(huì)是設(shè)備受潮,絕緣電阻下降,導(dǎo)致此裝置在整個(gè)安裝階段產(chǎn)生短路的問(wèn)題。其二,變壓器在安裝階段所產(chǎn)生的問(wèn)題。變壓器作為變電站的核心存在的主要部分,在進(jìn)行安裝時(shí)是最容易產(chǎn)生問(wèn)題的,其問(wèn)題主要有設(shè)備是否受潮、變壓器本身問(wèn)題、主變安裝后絕緣油過(guò)濾后各項(xiàng)指標(biāo)未能符合于相關(guān)標(biāo)準(zhǔn)或變壓器安裝時(shí)暴露在空氣的時(shí)間過(guò)長(zhǎng)導(dǎo)致受潮等問(wèn)題。在檢查變壓器之后,對(duì)其實(shí)施沖洗時(shí)若所運(yùn)用的變壓器油未能符合于相關(guān)標(biāo)準(zhǔn),那么也容易產(chǎn)生質(zhì)量問(wèn)題。其三,導(dǎo)線在壓接、安裝時(shí)所產(chǎn)生的問(wèn)題。例如鋁導(dǎo)線壓接出現(xiàn)散股、多股銅導(dǎo)線未能運(yùn)用銅線頭、導(dǎo)線排列不夠整齊、導(dǎo)線絕緣外皮碰傷絕緣受損、電纜未捆綁以及包扎等問(wèn)題。其四,防雷接地施工的問(wèn)題。若未能根據(jù)相關(guān)標(biāo)準(zhǔn)安裝防雷接地,則會(huì)加大其電阻,而接地電阻變大在遭受雷擊時(shí)則較難將大電流泄流至地下。在焊接防雷接地裝置時(shí),未能夠根據(jù)相關(guān)的焊接規(guī)范運(yùn)用了鍍鋅材料、焊接方法等,也會(huì)導(dǎo)致焊接電阻增大。另外,二次回路接地也容易產(chǎn)生問(wèn)題,沒(méi)能引至保護(hù)柜一點(diǎn)接地,進(jìn)而產(chǎn)生多點(diǎn)接地的狀況[3]。其五,設(shè)備調(diào)整層面的問(wèn)題。在調(diào)整設(shè)備的過(guò)程中,容易產(chǎn)生螺絲未擰緊,螺帽丟失或是松動(dòng)等情況,進(jìn)而則會(huì)導(dǎo)致設(shè)備不穩(wěn)定、導(dǎo)致噪聲、震動(dòng)等問(wèn)題。而對(duì)于繼電器來(lái)說(shuō),未能根據(jù)相關(guān)標(biāo)準(zhǔn)實(shí)施整定,則會(huì)導(dǎo)致漏電、觸電等情況的出現(xiàn)。在進(jìn)行設(shè)備調(diào)整時(shí),墊片總數(shù)不應(yīng)大于3片,而厚度須低于10mm,在整個(gè)調(diào)整期間,若未能夠根據(jù)規(guī)定來(lái)確定墊片的數(shù)量,也容易導(dǎo)致設(shè)備噪聲、震動(dòng)等問(wèn)題。
3 變電站電氣安裝施工中問(wèn)題的預(yù)防措施
3.1 加強(qiáng)過(guò)程控制
加強(qiáng)過(guò)程控制,有利于提升電氣設(shè)備安裝工程的整體質(zhì)量,主要通過(guò)控制過(guò)程,降低在安裝期間錯(cuò)漏問(wèn)題的出現(xiàn)概率,在此期間同時(shí)提升施工人員的安全意識(shí),從而保證施工質(zhì)量,使電氣設(shè)備安裝工程滿足相關(guān)法律法規(guī)及標(biāo)準(zhǔn)施工[4]要求。另外,還應(yīng)積極引入激勵(lì)及考核機(jī)制,針對(duì)施工人員在電氣安裝過(guò)程中的表現(xiàn),以考核的最終結(jié)果,予以相關(guān)施工人員適當(dāng)?shù)莫?jiǎng)懲,充分調(diào)動(dòng)全體施工人員的工作主動(dòng)性及熱情,利于提升變電站電氣設(shè)備安裝的質(zhì)量。
3.2 嚴(yán)控設(shè)備進(jìn)場(chǎng)質(zhì)量
在變電站電氣設(shè)備進(jìn)入施工現(xiàn)場(chǎng)前,要求根據(jù)施工圖紙的內(nèi)容及相關(guān)規(guī)范嚴(yán)格審查電氣設(shè)備,特別是要檢查平柜以及支架等構(gòu)件的質(zhì)量是否符合于相關(guān)標(biāo)準(zhǔn),在檢查過(guò)程中若發(fā)現(xiàn)存有問(wèn)題,應(yīng)迅速通知參建各方,同時(shí)禁止設(shè)備卸貨。以變電站電氣設(shè)備的運(yùn)用技術(shù)來(lái)說(shuō),應(yīng)在訂購(gòu)時(shí)就簽署相應(yīng)協(xié)議,并在協(xié)議中加以具體性規(guī)定,同時(shí)還應(yīng)說(shuō)明關(guān)鍵技術(shù)的主要形式,從而防止在設(shè)備驗(yàn)收階段受到不同標(biāo)準(zhǔn)的影響,而在此層面產(chǎn)生較大的爭(zhēng)議,有利于保障安裝施工的速度,避免造成其他方面問(wèn)題的發(fā)生。
3.3 重視施工圖紙交底工作
在變電站電氣設(shè)備安裝施工前期,電氣設(shè)備施工方應(yīng)組成技術(shù)團(tuán)隊(duì),參加設(shè)計(jì)交底工作及對(duì)施工圖紙進(jìn)行會(huì)審,編輯施工組織設(shè)計(jì)、施工方案、施工作業(yè)指導(dǎo)書(shū)、施工進(jìn)度計(jì)劃等文件,同時(shí)開(kāi)工前對(duì)施工班組進(jìn)行技術(shù)交底工作,做好過(guò)程質(zhì)量管控措施,確定質(zhì)量控制的關(guān)鍵工序并設(shè)立控制點(diǎn),有序施工[5]。
3.4 強(qiáng)化安裝期間質(zhì)量控制
接地線工作在開(kāi)展階段具備復(fù)雜性的特征,在安裝接地線時(shí),要求相關(guān)人員了解每條線路的主要走向,而后在安裝施工期間,有效整理線路,也要做好密封防銹工作,確保每條線路均能正確、科學(xué)的安裝。另外,在安裝電氣設(shè)備時(shí),搬運(yùn)物品時(shí)做到輕搬輕放。對(duì)于電氣儀表設(shè)備來(lái)說(shuō),在安裝期間需運(yùn)用精密儀器來(lái)操作,將儀表固定至相應(yīng)的部位上,從而通過(guò)上述方式來(lái)實(shí)現(xiàn)對(duì)于變電站電氣安裝期間的質(zhì)量控制,在最大程度上避免消極問(wèn)題的產(chǎn)生。
3.5 改進(jìn)二次接線工作
在進(jìn)行二次接線時(shí)還需實(shí)施技術(shù)比較,構(gòu)建責(zé)任考核機(jī)制,對(duì)相關(guān)工作人員實(shí)施評(píng)比,使相關(guān)工作人員能更為積極、主動(dòng)的開(kāi)展安裝工作,同時(shí)也能夠增強(qiáng)工作人員的責(zé)任心,讓其能夠嚴(yán)格根據(jù)相關(guān)標(biāo)準(zhǔn)來(lái)進(jìn)行規(guī)范性施工[6]。再者,在施工期間也要求相關(guān)工作人員有效調(diào)試現(xiàn)場(chǎng)的施工設(shè)備,強(qiáng)化監(jiān)理單位的主要職能,健全三級(jí)驗(yàn)收制度,二次接線工作期間是否存在問(wèn)題,發(fā)現(xiàn)問(wèn)題應(yīng)迅速采取措施加以解決,以防止問(wèn)題的進(jìn)一步加劇,從而以上述方式來(lái)做到改進(jìn)二次接線工作,保證二次接線工作的開(kāi)展質(zhì)量。
3.6 提升防雷接地安裝質(zhì)量
在安裝防雷接地裝置時(shí),應(yīng)嚴(yán)格遵守相應(yīng)制度與規(guī)范,在完成焊接后還應(yīng)測(cè)試電阻值,另外還需提高焊接人員的焊接技能,以此來(lái)提高防雷接地焊接的質(zhì)量。再者,應(yīng)嚴(yán)格控制材料的質(zhì)量,從而防止由于材料質(zhì)量問(wèn)題而影響到接地安裝的質(zhì)量,所以對(duì)材料方面也應(yīng)提起高度的重視,從而真正提升防雷接地安裝的總體質(zhì)量。
3.7 強(qiáng)化控制質(zhì)量關(guān)鍵點(diǎn)
在變電站電氣安裝施工期間控制質(zhì)量關(guān)鍵點(diǎn)也為一項(xiàng)十分關(guān)鍵的內(nèi)容,所以就要求質(zhì)量檢測(cè)以及電氣監(jiān)理相關(guān)工作人員均應(yīng)至施工現(xiàn)場(chǎng)之中,實(shí)施嚴(yán)格的監(jiān)督,以確保各道施工工序的合格性,這樣才能夠總體性保障安裝施工的質(zhì)量,尤其是對(duì)于設(shè)備安裝的高層位置以及軸線等,更應(yīng)予以高度的關(guān)注,以及務(wù)必要做到精準(zhǔn)落實(shí),這樣才利于強(qiáng)化保障安裝施工的開(kāi)展質(zhì)量。
4 結(jié)束語(yǔ)
伴隨我國(guó)電網(wǎng)建設(shè)腳步的日益加快,對(duì)于變電站電氣安裝施工的要求也隨之愈發(fā)嚴(yán)苛,所以在進(jìn)行變電站電氣安裝施工時(shí),務(wù)必要及時(shí)探析容易產(chǎn)生的問(wèn)題,而后對(duì)此類(lèi)問(wèn)題加以解決和防范,這樣才能夠在安裝期間防范這種問(wèn)題的出現(xiàn)。
參考文獻(xiàn):
[1]范建軍.變電站電氣安裝施工中存在的問(wèn)題及預(yù)防措施研究[J].電氣技術(shù)與經(jīng)濟(jì),2019(04):34-35.
[2]包林金.電氣安裝施工工程中存在問(wèn)題及預(yù)防措施[J].建材與裝飾,2019(04):203-204.
[3]李樹(shù)國(guó).電廠建設(shè)電氣安裝施工中存在的問(wèn)題及預(yù)防措施[J].電子世界,2018(07):137+139.
[4]張鎖印.分析變電站電氣安裝施工中存在的問(wèn)題及預(yù)防措施[J].中國(guó)戰(zhàn)略新興產(chǎn)業(yè),2017(32):161.
[5]劉小鸝.變電站電氣安裝施工中存在的問(wèn)題及預(yù)防措施[J].陜西水利,2017(S1):58-59.
[6]臧兆奇.變電站電氣安裝施工中存在的問(wèn)題及預(yù)防措施[J].黑龍江科技信息,2016(24):70.
[7]柴金義.電廠建設(shè)電氣安裝施工中存在的問(wèn)題及預(yù)防措施[J].科技創(chuàng)新與應(yīng)用,2016(21):222.