        Status of the Advanced Space-based Solar Observatory*

        2020-04-16 14:17:44GANWeiqun
        空間科學(xué)學(xué)報 2020年5期

        GAN Weiqun

        Status of the Advanced Space-based Solar Observatory*

        GAN Weiqun

        (210033)

        The Advanced Space-based Solar Observatory (ASO-S) was formally approved at the end of 2017. In the past two years, ASO-S underwent its official Phase-B and Phase-C studies. The Phase-B study was successfully accomplished by the end of April 2019, and the Phase-C study is being now undertaken until August 2020. Then the flight model is planned to finish within 16 months. Around the end of 2021, ASO-S will be ready in the launch state. We briefly summarize the history of ASO-S, the phase-B studies, and the phase-C studies.

        Space astronomy, Solar physics, Spacecraft

        1 Brief History of ASO-S

        The idea of Advanced Space-based Solar Observatory (ASO-S) was proposed in 2010, referring partially to SMESE, a joint Chinese-French mission[1]. Then in 2011 ASO-S was selected to do concept study (Phase-0/A) by a new program named as Strategic Priority Research Program of Space Science sponsored by the Chinese Academy of Sciences (CAS). Two years later, ASO-S satisfactorily finished the concept study and was successfully selected to undertake further intensive study (Phase-A/B) supported by the same channel. During that period, NNSFC (National Natural Science Foundation of China) provided even stronger financial support to ASO-S. In April 2016, ASO-S got a good mark in an assessment report issued by a top level committee organized by NSSC (National Space Science Center, CAS). Supported continuously by NNSFC, at the end of 2017 ASO-S was formally accepted by CAS after a serious competition with other candidates. Since then ASO-S has been going into the engineering study of official Phase-B and subsequent Phase-C.

        There are three payloads on ASO-S, which are the Full-disc vector MagnetoGraph (FMG), the Lyman-alpha Solar Telescope (LST), and the Hard X-ray Imager (HXI), respectively. For the first time in a single platform they will simultaneously observe the solar magnetic field, non-thermal image of solar flares, and the initiation of Coronal Mass Ejection (CME) and its early propagation, so as to study the relationships among solar magnetic field, solar flares, and CMEs. Explicitly, four major scientific objectives can be described as: (i) to observe simulta-neously non-thermal images of solar flares in hard X-rays, and the initiations of CME in Lyman-alpha waveband, in order to understand the relationships between flares and CMEs; (ii) to observe simultaneously full-disc vector magnetic field, energy build up and release of solar flares, and the formation of CMEs, in order to understand the causality among them; (iii) to observe the response of solar atmosphere to the eruptions, in order to understand the mechanisms of energy release and transport; (iv) to observe solar eruptions and the evolution of magnetic field, in order to provide clues for forecasting space weather.

        In November 2019, a special issue about ASO-S, including a total of 14 papers[2-15], was published in Research in Astronomy and Astrophysics (RAA). These papers summarized comprehensively the gen-eral framework, the scientific objectives, systematic designs, the payload schemes, prototype models, engineering models, scientific systems, the synthetic studies, and so on, up to the end of Phase-B and the beginning of Phase-C. The readers are encouraged to refer to that special issue for more details. We here mention briefly only the rough milestones in chro-nological order for the past two years.

        2 Phase-B Studies

        Officially, the Phase-B studies continued 16 months, from January 2018 to the end of April 2019. During this period, the work focused mainly on the satellite system, including the payloads.

        2.1 Satellite System in Phase-B

        Besides coordinating all the issues related to payloads, the satellite system has its own tasks like mission requirement analysis, preliminary scheme design, key technology solutions, validating experiments, and so on. Quite a number of documents were generated during this period, which summarized the tasks done and provided the scheme for the following works. Although the platform does not seem to be special, all the sub-systems should be considered and designed. How to ensure all the payloads pointing to the Sun with rather high accuracies is one of the key issues, which was finally solved through both smart design and process control. The whole architecture of the mission was mechanically experimented at the beginning of 2019. The evaluation on the entire work of the Phase-B was passed at the end of April 2019.

        2.2 Payloads in Phase-B

        The requirement analysis was first finished in the ini-tial stage of this period. Besides the interface parameters like weight, power, and dimensions, the detailed specification parameters of all three instru-ments were definitely defined. The solutions of key technologies for each payload are the main work during Phase-B. For the FMG, the key issues include the entrance window, imaging stabilization system, the bubble suppression in the filter, and so on. For the LST, the key issues include the suppression of stray- light, the measurement of stray-light, imaging stability, and so on. For the HXI, the key issue is concerned about the assembly of the grids, like grid stack technique, the alignment of front and rear grids, the stability of collimator, and so on. All of these key tech-nologies were properly identified during the Phase-B. The engineering proto-type models of the FMG, LST, and HXI were produced and tested. The integration of the payloads with the platform was also performed and some experiments like assembly, mechanics, vib-ration, thermal control were carried out.

        3 Phase-C Studies

        Officially, the Phase-C studies started from May 2019 and will finish at the end of July 2020. During this period, besides the satellite system, the scientific application system (including science preparations) has also been put on the agenda.

        3.1 Satellite System in Phase-C

        Based on the work done in Phase-B, at the beginning of Phase-C, the satellite system finished and improved the design of the whole platform, including seven subsystems of Mechanics, Thermal Control, AOCS, Electrical Power, OBDH, TT&C, and Data Transmission. The interfaces with other systems and detailed schedule were drawn up. Then the individual parts have been under fabrication. In July 2019, the electric performances of the platform together with all three payloads were jointly debugged. The integration and test work is scheduled to start no later than March 2020. All the work related to the qualification model is planned to finish by the end of July 2020.

        3.2 Payloads in Phase-C

        Like the satellite system, the schematic designs for FMG, LST, and HXI were first improved and finished. Then the individual parts for these three instruments were in parallel manufactured and the assembly for each instrument has almost been completed by the end of December 2019. As of the time of writing (the end of January 2020), the experiment, calibration, and environment tests are being done for these instruments separately. In March 2020, the qualification models of FMG, LST, and HXI will be delivered to the satellite system for integration and the overall test.

        3.3 Scientific Issues

        Besides the hardware work, scientific preparations have also been progressing for quite a time. Two major research grants were provided by NNSFC and CAS respectively. The science team, led by the chief scientist of ASO-S, was organized, which focuses mainly on the data deductions and usages for the outputs of the payloads in the future. Certainly, this kind of work is closely related to the Science Operation and Data Center (SODC)[11], which consists in fact four divisions: scientific operation, data man-agement, data analysis center, and user service. So far SODC has finished its schematic design and the software work has started accordingly. Besides, the first ASO-S international workshop was held in 15–18 January, 2019 at Nanjing. More than 100 partici-pants from over ten countries attended the meeting.

        4 Conclusions

        By now ASO-S is undertaking its Phase-C study. All the works look smooth and are on the track of the schedule, although the timetable shows a little tense sometimes. It is expected that the flight model can be started from August 2020 and then at the end of 2021 or in the early of 2022, ASO-S could be launched. In this period, the special issue of ASO-S[2-15]is highly recommended to the readers who would like to know more details about the mission.

        [1] VIAL J C, AUCHERE F, CHANG J,. SMESE: a small explorer for solar eruptions [J]., 2007, 40:1787

        [2] GAN W Q, DING M D, HUANG Y,. Preface: Advanced Space-based Solar Observatory (ASO-S) [J]., 2019, 19:155

        [3] GAN W Q, ZHU C, DENG Y Y,. Advanced Space- based Solar Observatory (ASO-S): an overview [J]., 2019, 19:156

        [4] DENG Y Y, ZHANG H Y, YANG J F,. Design of the Full-disk Magneto Graph (FMG) onboard the ASO-S [J]., 2019, 19:157

        [5] LI H, CHEN B, FENG L,. The Lyman-alpha Solar Telescope (LST) for the ASO-S mission - I. Scientific objectives and overview [J]., 2019, 19:158

        [6] CHEN B, LI H, SONG K F,. The Lyman-alpha Solar Telescope (LST) for the ASO-S mission - II. Design of LST [J]., 2019, 19:159

        [7] ZHANG Z, CHEN D Y, WU J,. Hard X-ray Imager (HXI) onboard the ASO-S mission [J]., 2019, 19:160

        [8] SU J T, BAI X Y, CHEN J,. Data reduction and calibration of the FMG onboard ASO-S [J]., 2019, 19:161

        [9] FENG L, LI H, CHEN B,. The Lyman-alpha Solar Telescope (LST) for the ASO-S mission - III. Data and potential diagnostics [J]., 2019, 19:162

        [10] SU Y, LIU W, LI Y P,. Simulations and software development for the Hard X-ray Imager onboard ASO-S [J]., 2019, 19:163

        [11] HUANG Y, LI H, GAN W Q,. The Science Operations and Data Center (SODC) of the ASO-S Mission [J]., 2019, 19:164

        [13] VIAL J C. The synergy between the payloads on the ASO-S mission [J]., 2019, 19:166

        [14] KRUCKERS S, HURFORD G, SU Y,. Joint hard X-ray observations with ASO-S/HXI and SO/STIX [J]., 2019, 19:167

        P 35

        GAN Weiqun. Status of the Advanced Space-based Solar Observatory., 2020, 40(5): 704-706. DOI:10.11728/ cjss2020.05.704

        * Supported by Chinese Academy of Sciences (XDA15052200) and by National Natural Science Foundation of China (U1731241, 11921003, U1931138)

        February 13, 2020

        E-mail: wqgan@pmo.ac.cn

        国产伦精品一区二区三区| 少妇下面好紧好多水真爽| 亚洲av中文无码乱人伦在线观看| 亚洲av成人无码精品电影在线| 久久久精品久久波多野结衣av| 日本精品人妻无码77777| 2021国产精品久久| 国产偷国产偷亚洲高清| 激情综合色综合啪啪开心| 欧美日韩国产一区二区三区不卡 | 亚洲天天综合色制服丝袜在线 | 美女高潮流白浆视频在线观看| 亚洲乱熟妇一区二区三区蜜桃| 天天躁夜夜躁av天天爽| 国产成人无码免费网站| 国产v精品成人免费视频400条 | av天堂最新在线播放| 国产精品r级最新在线观看| 521色香蕉网站在线观看| 91国产视频自拍在线观看| 欧美老妇牲交videos| 97夜夜澡人人爽人人喊中国片| 人妻中出精品久久久一区二| 亚洲av男人的天堂在线| 国产亚洲精品a片久久久| 亚洲国产区男人本色| 米奇亚洲国产精品思久久| 一本久道高清视频在线观看| 久久精品免费观看国产| 在线视频中文字幕乱人伦| 国产中文字幕亚洲国产| 精品国产青草久久久久福利| 久久久精品久久波多野结衣av| 黄色三级国产在线观看| 中文有码亚洲制服av片| 亚洲 自拍 另类 欧美 综合| 无码一区二区三区久久精品| 91视色国内揄拍国内精品人妻 | 亚洲男人的天堂网站| 色哟哟精品中文字幕乱码| 欧洲乱码伦视频免费|