        Optimization Program for Difficult-to-Produce Reservoir in Bonan Oil Feild

        2019-08-05 09:23:16ZHANGLu

        ZHANG Lu

        [a]Drilling Technology Research Institute, Shengli Petroleum Engineering Co., Ltd, Sinopec, Dongying, China.

        Abstract After many years’ development of oil reservoir in Shengli, tons of oil have been drilled out of reservoir and the condition of underground has been changed a lot.Nowadays, the quantity of oil production has been reduced rapidly, therefore, there is a new solution for old reservoir,to redevelop this reservoir with appropriate adjustment in drilling design and method. There are two main changes in this new solution, first one is to reduce the cost of wells in Yi 184 block. The second factor is optimizing parameters of the drilling design, such as casing program, drilling fluid system, drilling fluid material and etc. This paper is going to describe a solution for difficult-to-produce reservoir of Yi 184 block in Bonan oil field. It will be divided into 3 parts. The first part is introduction which is about the characteristics of formations and drilling difficulties in Yi 184 block. Second part is going to present the optimization of drilling design. Optimization of well construction and drilling fluid will be present in this part. The last part of this paper is a conclusion of the optimization program.

        Key words: Optimization; Difficult-to-produce;Adjustment; Redevelop; Yi 184 block

        INTRODUCTION

        Formation Characteristic of Yi 184 Block

        This block is between two reservoir-control faults, and the faults inside Yi block are also complicated. Oil bear formation are No.3 and No.4 sand set of Shahejie group. No.3 sand set is mainly sandstone and siltstone,No.4 sand set contains sandstone, siltstone and coarsegrained sandstone. Porosity of the formation is 11%, and Permeability of the reservoir is 5.5 millidarcy, therefore,this is low-porosity and extra-low permeability reservoir.Due to the reservoir pressure coefficient is 1.56, and geothermal gradient is 3.71℃/100m, so this reservoir is normal temperature and high pressure formation (Tang &Shao, 2007). There is a reservoir pressure statistical table of nearby blocks shows that adjacent blocks are generally belong to high pressure formation.

        Table 1 Reservoir Pressure Statistical Table of Shasi Formation of Yi 176 Block

        DriIIing DifficuIties and Corresponding TechnicaI Measures

        There are 27 wells in this program, 18 wells are production well,9 wells are steamed well. Based on the data information we learned about the adjacent wells, the Table 2 indicates the drilling difficulties we met during those wells’ drilling process.

        Table 2 Drilling Difficulties of Adjacent Wells

        According to the complex situation happened during the drilling process of adjacent wells, the difficulties of Yi 184 block’s optimization program are:

        ? Lots of wells in the same block, anti-collision is difficult.

        ? Sloughing and sticking happen easily due to the soft formation of the upper part of Guantao group.

        ? High pressure exists in Shasi section, apply drilling fluid with high density may lead to mud loss.

        ? Drilling rate is low at Shasi formation.

        ? When it drills to 4418.64m, the well depth of second spud is too long to cementing.

        ? H2S was detected during drilling process of adjacent well.

        The Corresponding technical measures are:

        ? Make the drilling order reasonable based on the maximum anti-collision distance between wells.

        ? Apply suitable drilling system. Using Calcium-treatedpolymer drilling fluid for Dongying formation to improve the support and inhibitive ability. Using multiple saltsplugging and anti-collapse drilling fluid system for easily collapsing and leaking formation, to hold well steady, and in the meanwhile this drilling fluid system provides good protection for reservoir (Guan, Li, & Zhou, 2001).

        ? Enhance monitoring on field and prepare enough sulfur removal agent(basic zinc carbonate)for the possibility of H2S in Shasi formation.

        ? Using cone and PDC bits in preference to other bits.

        ? Optimizing cementing method. Apply double density cementing while cementing with long sealing section and apply plastic micro expansion cement slurry system above reservoir.

        1.1.2 Casing Program of This Block

        1. THE OPTIMIZATION OF DRILLING DESIGN

        1.1 Well Construction

        1.1.1 Principle of Well Construction Design

        The design of well construction is directly to the benefits of drilling and oilfield development. According to current drilling technology and the characteristics and pressure of this formation, the well construction should be designed under the principle of safe, high-efficiency drilling and protection of oil and gas reservoir (Ouyang, Liu, &Wang, 2011). There are some basic requests for the well construction design (Guan, Li, & Zhou, 2001):

        ? It could effectively protect oil and gas zones, so that oil and gas reservoirs with different pressure systems would not be damaged by drilling fluid.

        ? It could avoid blowout, collapse and sticking,especially lost circulation, and it can create good conditions for rapid, safe, high quality and economical drilling.

        ? It should minimize the difficulty of construction work and ensure safe drilling.

        ? It would improve drilling speed, shorten well construction period, and achieve higher technical and economic benefits.

        ? It should meet the requirements of oil production engineering.

        ? It should be beneficial to well trajectory control, and be conducive to accurate targeting.

        Table 3 Casing Program for Production Well

        Table 4 Casing Program for Steamed Well

        There are 27 wells of Yi 184 block. 18 wells are production well and the rest wells are steamed well.Different well type using different casing program. For the production and steamed well, the purpose of surface casing is to sealing the unconsolidated formation and shallow water layer and to setting wellhead. The function of technical casing is to sealing the layer with low pressure-bearing capacity and creating suitable conditions for high pressure formation of third spud. See the detailed content in Table 3 and 4.

        1.2 The Optimization of Drilling Fluid Design

        1.2.1 Analysis of Drilling Formation for Drilling Fluid

        The formation of this block is composed of Shahejie group, Dongying group, Guantao group, Minghuazhen group and Quaternary layer. Based on the actual drilling information, using drilling fluid system should consider the following difficulties.

        ? Guantao group and upper formation have poor lithology, weak bonding, easily flushing, collapsing and leaking. It should be focused on anti-collapse and leakage control to improve well quality.

        ? The formation temperature of Shahejie group is high,mudstone is easily hydrated which could causing block collapse. Drilling fluid system should enhance wellbore protection, anti-collapse, anti-sticking and ensure the high temperature stability (Sun, Yang, & An, 2009).

        1.2.2 Application of Drilling Fluid System

        Table 5 Drilling Fluid System for Each Section

        Using multiple salts-plugging and anti-collapse drilling fluid system for this block has lots of advantages (Guan,Li, & Zhou, 2001). Firstly, it would solve the difficulties of Shasan group which are high formation pressure, easily collapsing and reaming, and high degree of mineralization.Secondly, it would solve the problem caused by drilling mud couldn’t fall which are no use of big mud pool for circulating, and less inhibitive ability. Thirdly, it is highclean drilling mud, and it could achieve drill bit selfcleaning and improve the efficiency of breaking rock of PDC drill bit. Finally, this drilling fluid is reusable which could increase the production cost.

        1.3 The Optimization of Cementing

        1.3.1 Principles of Casing String Design

        The design of casing string should follow the principles as below (Tang, 2005).

        ? Satisfied the technological requirement of drilling operation, reservoir development, formation pressure, oil production mode and reform of production layer.

        ? All the strings’ steel grade and thickness have a wide range of options.

        ? Satisfied the requirement of drilling fluid property and cementing.

        ? The design of casing string should be economically fair, appropriate and resourceful.

        ? It should have high reliability, convenient craftwork and strong operatbility.

        1.3.2 Casing Determine

        According to the information of drilled wells, it will apply three spuds casing. For production well, it designed as Ф177.8mm intermediate casing and Ф114.3mm liner for production casing. For steamed well, it designed as Ф193.7mm intermediate casing and Ф127.0mm liner for production casing. Due to this block is ultra-low porosity and ultra-low permeability reservoir, use P110 steel grade liner for production casing to meet the requirements of later fracturing production. The casing accessories and tools used in cementing should be consistent with the strength of the casing string, and the buckle should match the casing buckle type. (Sun, Yang, & An, 2009)

        1.3.3 Cementing Method

        For production well, apply inner string cementing for surface casing, and the cement is required to return to the ground. Use primary cementing and variable density cement slurry system for intermediate casing, and the cement is required to return to the ground. Utilize liner cementing for production casing and use high-temperature with plastic and micro-expansive cement, weighting cement slurry, and the cement is required to return to the hanger bell mouth.

        For steamed well, apply inner string cementing for surface casing, and the cement is required to return to the ground. Use primary cementing and conventional hightemperature cement slurry system for intermediate casing,and the cement is required to return to 2000m. Utilize primary cementing and variable density cement slurry system for production casing, and the cement is required to return to the ground.

        CONCLUSION

        Widespread use has likely been curtailed by the challenging commodity price environment that has forced operators to drill and complete wells faster to lower recovery costs and provide production to the market quicker. With the recent decline in oil and gas prices, operators are considering all possibilities to help reduce lifting costs. Optimization program for difficultto-produce reservoir reduced the production cycle and lifting costs, therefor, this optimization program will be widespread use for difficult-to-produce reservoir.

        性猛交╳xxx乱大交| 国产精品涩涩涩一区二区三区免费 | 最新国产精品国产三级国产av| 五月天中文字幕日韩在线| 久久国产亚洲高清观看| 免费啪啪视频一区| 97在线视频人妻无码| 国产女人高潮视频在线观看| 久久av无码精品一区二区三区| 天堂女人av一区二区| 国产不卡视频在线观看| 一本大道无码人妻精品专区| 久久亚洲av永久无码精品| 福利片免费 亚洲| 免费一区二区在线观看视频在线| 国产a国产片国产| 亚洲日韩乱码中文无码蜜桃臀| 成激情人妻视频| 亚洲国产成人久久精品一区| 色综合久久精品亚洲国产| 国产精品亚洲欧美云霸高清| 亚洲一区二区女优av| 国产精品久久久免费精品| 一品二品三品中文字幕| 国产一级三级三级在线视| 中文字幕人妻久久一区二区三区| 国产精品理论片在线观看| 18禁高潮出水呻吟娇喘蜜芽 | 中文精品久久久久中文| 极品粉嫩嫩模大尺度视频在线播放| 领导边摸边吃奶边做爽在线观看 | 越猛烈欧美xx00动态图| 成人无码无遮挡很H在线播放| 亚洲中文字幕在线第六区| 天天夜碰日日摸日日澡性色av| 97久久天天综合色天天综合色hd| 亚洲五月七月丁香缴情| 国产婷婷成人久久av免费| 亚洲娇小与黑人巨大交| 狼人国产精品亚洲| 国产一级自拍av播放|