劉丹丹
摘 要:隨著建筑基坑的深度越來越深,深基坑施工存在的各種安全隱患需要引起人們的注意。采取切實(shí)有效的基坑監(jiān)測技術(shù),能夠?qū)邮┕さ刭|(zhì)及周邊建筑進(jìn)行勘測,方便基坑工程施工的同時(shí),保障了基坑施工和周邊建筑物的安全。本文對某深基坑進(jìn)行沉降觀測研究,闡述了深基坑監(jiān)測技術(shù)手段以及監(jiān)測的注意事項(xiàng)。
關(guān)鍵詞:深基坑;基坑監(jiān)測;沉降觀測
中圖分類號:TU753 文獻(xiàn)標(biāo)識碼:A 文章編號:1003-5168(2018)14-00128-02
Application of Foundation Pit Monitoring Technology in
Deep Foundation Pit Construction
LIU Dandan
(Liaoning Forestry Vocation-Technical College,Shenyang Liaoning 110101)
Abstract: The depth of the foundation pit is getting deeper and deeper, and the hidden dangers in the construction of deep foundation pit need to be paid attention to. A practical and effective foundation pit monitoring technique can be used to survey the construction geology and surrounding buildings of the foundation pit, while the construction of the foundation pit is convenient, and the safety of the construction of the foundation pit and the surrounding buildings can be ensured. This paper observed and researched the settlement of a deep foundation pit, expounded the technical means for monitoring the deep foundation pit and points for attention in the monitoring.
Keywords: deep foundation pit;foundation pit monitoring;settlement observation
本文以遼寧省撫順市某深基坑施工項(xiàng)目為例,對該項(xiàng)目的圍護(hù)樁頂水平、豎向位移、地表沉降和相鄰建筑物沉降等項(xiàng)目進(jìn)行了定期觀測和數(shù)據(jù)分析,現(xiàn)就建筑物和地表沉降監(jiān)測、圍護(hù)樁頂水平位移監(jiān)測兩項(xiàng)監(jiān)測的內(nèi)容進(jìn)行簡要闡述。
1 監(jiān)測點(diǎn)布置原則
1.1 監(jiān)測點(diǎn)布設(shè)基本要求
測點(diǎn)布設(shè)基本要求包括以下幾方面。
①監(jiān)測點(diǎn)布設(shè)的先后順序應(yīng)綜合考慮周邊環(huán)境與圍護(hù)結(jié)構(gòu)體系完整情況,一般首先選取影響范圍內(nèi)的建(構(gòu))筑物進(jìn)行監(jiān)測點(diǎn)布設(shè),其次布設(shè)地表監(jiān)測點(diǎn),最后結(jié)合周邊環(huán)境情況及圍護(hù)結(jié)構(gòu)情況,布設(shè)圍護(hù)結(jié)構(gòu)樁(墻)頂水平位移觀測點(diǎn)[1]。②周邊環(huán)境、圍護(hù)結(jié)構(gòu)體系測點(diǎn)應(yīng)盡量布置在同一斷面內(nèi)。③測點(diǎn)布置于能夠反映施工影響的典型部位,應(yīng)能夠切實(shí)反映出工程安全狀態(tài)。
1.2 周邊環(huán)境監(jiān)測布點(diǎn)方法及原則
周邊環(huán)境監(jiān)測布點(diǎn)的方法及原則見表1。
2 監(jiān)測頻率及周期
2.1 周圍環(huán)境監(jiān)測頻率
周圍環(huán)境監(jiān)測周期為計(jì)劃監(jiān)測周期[2],具體安排可根據(jù)現(xiàn)場實(shí)際監(jiān)測情況及時(shí)調(diào)整,尤其是在基坑第三步施工期間。監(jiān)測數(shù)據(jù)基本穩(wěn)定后,可以適當(dāng)延長觀測周期,數(shù)據(jù)穩(wěn)定后可以每月觀測一次。
2.2 監(jiān)測周期
項(xiàng)目施工前,先對各布設(shè)點(diǎn)進(jìn)行初始值觀測;施工運(yùn)行與管理階段需按照技術(shù)要求進(jìn)行動(dòng)態(tài)監(jiān)測[3];項(xiàng)目竣工時(shí),施工影響安全的因素消除,監(jiān)測對象變形趨于穩(wěn)定后,監(jiān)測單位可向甲方提交停測申請,經(jīng)批準(zhǔn)后方可停止相應(yīng)的監(jiān)測工作。
3 監(jiān)測方法
為進(jìn)行建筑物和地表沉降監(jiān)測、圍護(hù)樁頂水平位移監(jiān)測,本項(xiàng)目布設(shè)建(構(gòu))筑物沉降變形監(jiān)測控制網(wǎng)(點(diǎn)),控制點(diǎn)由基準(zhǔn)點(diǎn)和工作基點(diǎn)組成。根據(jù)待監(jiān)測建(構(gòu))筑物的具體位置分布及需監(jiān)測對象分布情況,要求控制網(wǎng)(點(diǎn))不相關(guān)。為了有檢核條件,要與觀測點(diǎn)構(gòu)成閉合網(wǎng)、附合網(wǎng)(路線)。
3.1 水平位移觀測
3.1.1 水平位移觀測方法。首先,控制點(diǎn)的水平位移觀測采用導(dǎo)線測量方法。其次,采用極坐標(biāo)方法對監(jiān)測點(diǎn)進(jìn)行觀測。最后,將監(jiān)測控制點(diǎn)作為測站點(diǎn),選擇一個(gè)另外的監(jiān)測控制點(diǎn)做后視定向,即確立監(jiān)測基準(zhǔn)點(diǎn)。
3.1.2 數(shù)據(jù)處理及分析
3.1.2.1 數(shù)據(jù)處理及平差計(jì)算。所有測量記錄數(shù)據(jù)在平差前應(yīng)進(jìn)行100%復(fù)核,根據(jù)各期變形觀測點(diǎn)的平面坐標(biāo)較差,可計(jì)算出垂直于基坑方向的矢量位移、階段變形較差、階段變形速率、累計(jì)變形量等數(shù)據(jù)。最后得到的平差值應(yīng)達(dá)到相應(yīng)的精度要求,平差后坐標(biāo)據(jù)取位應(yīng)精確到0.1mm。
3.1.2.2 變形數(shù)據(jù)分析。判斷觀測點(diǎn)變形是否穩(wěn)定應(yīng)遵循以下原則。①選取變化穩(wěn)定的觀測點(diǎn)作為基準(zhǔn)點(diǎn)進(jìn)行平差計(jì)算。②相鄰周期觀測點(diǎn)變形值較差的限差取二倍中誤差。③雖然相鄰周期變形較差小,但連續(xù)多期變形較差較大,此種情況也應(yīng)視為發(fā)生變形。
3.2 沉降觀測
3.2.1 沉降觀測方法及精度要求。沉降觀測采用電子水準(zhǔn)儀進(jìn)行幾何水準(zhǔn)測量,水準(zhǔn)網(wǎng)布設(shè)成閉合或附合水準(zhǔn)網(wǎng)(路線)。沉降監(jiān)測要嚴(yán)格按照《建筑變形測量規(guī)范》(JGJ 8—2007)技術(shù)標(biāo)準(zhǔn)執(zhí)行。
3.2.2 沉降觀測注意事項(xiàng)。第一,為保證觀測精度,在項(xiàng)目開始前和結(jié)束后均應(yīng)對觀測儀器及附件進(jìn)行檢驗(yàn),項(xiàng)目實(shí)施過程中也應(yīng)進(jìn)行定期儀器及附件的檢驗(yàn)。第二,觀測過程盡量保持相同的觀測條件(相同的外界環(huán)境除外),以保證所有觀測成果均為同精度觀測。第三,選擇合適的觀測條件,保證條形碼尺成像穩(wěn)定。第四,觀測時(shí),將電子水準(zhǔn)儀從儀器箱中取出靜置一段時(shí)間再觀測,使儀器溫度和外界環(huán)境溫度相同。第五,數(shù)字水準(zhǔn)儀不能逆光觀測,避免成像不清晰造成觀測不準(zhǔn)確。
4 結(jié)論
通過本文的論述,可以得出以下結(jié)論。①工作基點(diǎn)宜埋設(shè)有強(qiáng)制對中裝置的固定觀測墩,可消除對中誤差,提高觀測精度,同時(shí)可以提高工作效率,而且在復(fù)雜的工地上也容易保護(hù)點(diǎn)位。②工作基點(diǎn)離基坑較近時(shí),要進(jìn)行工作基點(diǎn)穩(wěn)定性的動(dòng)態(tài)觀測。③監(jiān)測數(shù)據(jù)應(yīng)及時(shí)處理和分析,發(fā)現(xiàn)安全隱患及時(shí)與建設(shè)單位及施工方商討,采用合理有效的方法解決實(shí)際問題。④編制監(jiān)測方案時(shí),要設(shè)立基坑危險(xiǎn)警報(bào)閾值。
參考文獻(xiàn):
[1]黃海波.基坑監(jiān)測技術(shù)在深基坑中的應(yīng)用探討[J].科技創(chuàng)新與應(yīng)用,2012(10):209.
[2]樊星國,陸曄.淺談基坑監(jiān)測在深基坑工程中的應(yīng)用[J].山西青年,2013(14):217.
[3]王俊杰.監(jiān)測技術(shù)在深基坑施工中的應(yīng)用[J].山西建筑,2011(10):60-61.