        Interference Level Simulation and Analysis of the Power-frequency Parameter Measurement for UHVDC Transmission Lines

        2018-01-09 13:20:11ZHANGQingqingWEIJingZHANGYanWANGHuajiaLIChangwei
        山東電力技術(shù) 2017年12期
        關(guān)鍵詞:濟寧工頻電力公司

        ZHANG Qingqing,WEI Jing,ZHANG Yan,WANG Huajia,LI Changwei

        (1.State Grid Shandong Electric Power Research Institute,Jinan 250003,China;2.State Grid Jining Electric Power Supply Company,Jining 272023,China;3.Shandong Zhongshi Yitong Group Co.,Ltd.,Jinan 250003,China)

        Interference Level Simulation and Analysis of the Power-frequency Parameter Measurement for UHVDC Transmission Lines

        ZHANG Qingqing,WEI Jing,ZHANG Yan,WANG Huajia,LI Changwei

        (1.State Grid Shandong Electric Power Research Institute,Jinan 250003,China;2.State Grid Jining Electric Power Supply Company,Jining 272023,China;3.Shandong Zhongshi Yitong Group Co.,Ltd.,Jinan 250003,China)

        By analyzing operating conditions of the parallel lines near the UHVDC transmission line,considering the geographical environment,phase sequence,tower type,wire erection mode,soil resistivity and other related factors,the interference level of the power-frequency parameter measurement for the Zhalute-Qingzhou UHVDC transmission line is calculated.The calculation results can help providing a theoretical guidance for the power-frequency parameter measurement scheme and guarantee the safety of personnel and equipment.

        UHVDC;transmission line;power-frequency parameter measurement;interference level

        0 Introduction

        The±800 kV Zhalute-Qingzhou UHVDC transmission project is the first UHV DC transmission project inShandong,whichpassesthroughInnerMongolia,Hebei,Tianjin and Shandong,adding up to 3 provinces and 1 municipality.The length of the transmission line is 1 240 km,which is closely parallel to a number of 1 000 kV UHV AC lines and 500 kV EHV lines,and is parallel to±800kV Ximeng-Taizhou UHV DC transmission line within the same corridor in a long distance.

        The induced voltage of the transmission lines can be up to tens of thousands of volts[1].Therefore,in the situation of large amount neighboring lines,high voltages,long parallel distance and small spacing between lines,the line parameter tester and the testing equipment of±800 kV Zhalute-Qingzhou UHVDC transmission are facing severe challenges.In order to develop a scientific DC transmission line parameter test scheme and guarantee the safety of UHVDC transmission line parameter testers and test equipment,it is necessary to understand the interference level in the first step before site operation.

        By analyzing of the design data of the±800 kV Zhalute-Qingzhou UHVDC transmission line and its adjacent lines,the interference level of the ±800 kV Zhalute-Qingzhou UHVDC transmission line was simulated and analyzed before the test,which provides significant technical support for the scheme establishment of safety measurement and company outage.

        1 Distribution of the Adjacent Lines of the UHVDC Transmission Lines

        There are 4 main lines that are parallel to the Zhalute-Qingzhou UHVDC transmission line,including the±800 kV Ximeng-Taizhou UHVDC transmission line,the 1 000 kV Mengxi-Tianjin Nan UHVAC transmission line,the 1 000 kV Ximeng-Shandong UHVAC transmission line,500 kV Binyou I,II EHVAC transmission lines.

        The parallel distribution situation of the±800 kV Zhalute-Qingzhou UHVDC transmission line with its adjacent UHVDC lines are shown in Table 1.The parallel distribution situationof its main adjacent AC lines are listed in Table 2.

        Table1 The parallel distribution of the±800 kV Zhalute-Qingzhou UHVDC transmission line

        Table2 TheparalleldistributionofthemainadjacentAClines of the±800 kV Zhalute-Qingzhou UHVDC transmission line

        2 Simulation

        2.1 The main parameters of the line

        The wire type of the±800 kV Zhalute-Qingzhou UHVDC transmission line is 8 ×JL1 /G3A-1250 /70 and 8×JL1/G2A-1250/70.The split distance of the 8×JL1 /G3A-1250 /70 wire is 550 mm,DC resistance is 0.023 Ω /km.The split distance of the 8 ×JL1 /G2A-1250/70 wire is 550mm,DC resistance is 0.02291Ω /km.Oneground wiretypeisJLB20A-150,theDC resistance is 0.580 7 Ω /km.the other ground wire type is OPGW-150,the DC resistance is 0.558 Ω /km.The soil resistivity is 2.83~5 580 Ω·m.

        2.2 Simulation and modeling method

        Parallel line induced voltage calculation applies the method of modeling and simulating the AC and DC part separately.The influence caused by the interaction of all the AC lines is considered in the AC induced voltage modeling and simulation.The DC induced voltage modeling and simulation applies the same principle.

        The simulation of the induced voltage uses the segmentation modeling method.The geo-environment along the transmission line,phase sequence,tower type,lead-erection mode,soil resistivity and other factors are comprehensively considered.

        The operation conditions of the parallel operating line is simulated using the power flow and terminal voltage[2].

        The voltage difference between the head and the end of the line should be considered in the simulation.Induced voltage observation devices model are applied at both ends of the line.

        Due to the large cross-over angle of the adjacent spanned lines,its impact on the UHV transmission line is not considered[3].

        The calculation and simulation method of the AC induced voltage is detailed in reference[4-5].In the calculation of the DC induced voltage,the distance between polar conductors of the Zhalute-Qingzhou UHVDC transmission line is 18~22 m.The line uses the Bergeron model.The detailed line model is illustrated in Fig.1,the model for the induced voltage calculation of the DC line is illustrated in Fig.2.

        Fig.1 The model of the DC transmission line

        3 Calculation Results and Analysis

        3.1 Calculation results

        According to the simulation results,the calculation results of induced voltage of the Zhalute-Qingzhou UHVDC transmission line are shown in Table 3~4.(Since the electromagnetic induced voltage is much smaller than the electrostatic induced voltage[4],the influence of electromagnetic induced voltage is not considered in the calculation).

        Table 3 The calculation value of the AC induced voltage before parameters test kV

        Table 4 The calculation value of the DC induced voltage before parameters test kV

        3.2 Calculation results analysis

        It can be seen from Table 3 and Table 4 that the DC induced voltage of Zhalute-Qingzhou UHVDC transmission line is very large,the maximum value of Zhalute side can reach 40,000 volts,and the maximum value of Qingzhou side can reach 60000 volts,which will cause great potential risks to the testers and the testing equipment.Therefore,the company outage scheme of the Zhalute-Qingzhou parallel DC line before the testing work is considered,and the simulation ofthecompanyoutage schemeisconducted,the detailed results is listed in Table 5.

        Table 5 The calculation value of the accompany outage DC line kV

        Fig.2 The model for the induced voltage calculation of the DC transmission line

        It can be seen from Table 5 that stop the operation of a single line of the positive or negative pole of Xitai line (single pole operation) will cause a greater induced voltage value.In order to meet the needs of the field test,both lines of the positive and negative pole should quit from operation.

        4 Conclusions

        This paper simulates the interference level before the UHVDC line parameter testing by modeling and simulation,and provides theoretical guidance for the formulation of safety measures,safety equipment deployment,and the establishment of the company outage scheme.

        According to the analysis of the simulation results,the DC induced voltage of the±800kV Zhalute-Qingzhou UHV line can reach 46.94 kV when the±800 kV Xitai line is operating with no load,and the AC induced voltage is over 2 000 V.Thus the main problem in line parameter testing is the high DC induced voltage.The connection and removal of the test lines and the frequent operation of switches during the line parameter testing procedure bring the risk of electric shock.

        Therefore,it is necessary to stop the operation of the ±800 kV Ximeng-TaizhouUHVDC line.After the accompany outage,DC induced voltage will be reduced to a very smallvalue,which meets the testing requirements,and the operation of both poles should be stopped.According to the simulation results,the single pole operation will increase the induced voltage of the Zhalute-Qingzhou UHV line.

        Reference

        [1]LIU Haojun,YAN Guozeng,WANG Shaohua.Analysis of Electrostatic Induced Voltage on 1 000 kV Wannan-Zhebei UHV AC Transmission Line[J].High Voltage Engineering, 2015, 41(11):3687-3693.

        [2]GUO Zhihong,YAO Jinxia,CHENG Xueqi,et al.Study and Measurement of Induced Voltage and Current for 500 kV Doublecircuit Line on Same Tower[J].High Voltage Engineering,2006,32(5):11-14,50.

        [3]WANG Shaohua,HU Wentang,ZOU Guoping,et al.Influence of Adjacent Transmission Lines on Power Frequency Parameter Measurement for Anhui-to-East UHV Transmission Line [J].Power System Technology,2014,38(5):1 163-1 168.

        [4]ZHANG Qingqing,WEI Jing,ZHANG Gaofeng,et al.Interference Level Calculation and Measurement of UHV Transmission Line Frequency Parameters Test[J].Shandong Electric Power,2016,43(12):12-14,33.

        [5]ZHAO Songtao.Simulation of electromagnetic induction between parallel AC and DC Transmission lines[D].Baoding:North China Electric Power University,2006.

        特高壓直流輸電線路工頻參數(shù)測試干擾水平仿真分析

        張青青1,韋 景2,張 巖1,王華佳1,李昌衛(wèi)3
        (1.國網(wǎng)山東省電力公司電力科學研究院,山東 濟南 250003;2.國網(wǎng)山東省電力公司濟寧供電公司,山東 濟寧 272023;3.山東中實易通集團有限公司,山東 濟南 250003)

        通過分析特高壓直流輸電線路并行線路運行工況,綜合考慮輸電線路沿線地理環(huán)境、相序、塔型、導線架設(shè)方式、土壤電阻率等因素,對扎魯特—青州特高壓直流輸電線路工頻參數(shù)測試的干擾水平進行仿真計算,為特高壓直流輸電線路工頻參數(shù)測試方案制定提供參考,保障了該線路工頻參數(shù)測試人員及設(shè)備的安全。

        特高壓直流;輸電線路;工頻參數(shù)測試;干擾水平

        TM744

        A

        1007-9904(2017)12-0012-04

        date:2017-09-20 ZHANG Qingqing(1984),

        M.Sc.Degree in Electrical Engineering from Xi'an Jiaotong University.She’s currently an engineer of State Grid Shandong Electric Power Research Institute.Her research interests include power quality problems and transmission line parameter measurement.

        猜你喜歡
        濟寧工頻電力公司
        濟寧華隆機械制造有限公司
        中國造紙(2022年8期)2022-11-24 09:43:40
        國網(wǎng)甘肅省電力公司創(chuàng)新成果展示
        巨怪電力公司面試中
        山東濟寧卷
        學生天地(2020年31期)2020-06-01 02:32:24
        濟寧玉園生物科技有限公司
        中國釀造(2019年9期)2019-10-08 05:44:04
        大型電力公司面臨的財務(wù)風險
        消費導刊(2018年8期)2018-05-25 13:20:07
        淺析工頻過電壓故障研究
        電子制作(2017年8期)2017-06-05 09:36:15
        淺議交流工頻耐壓試驗
        可穿戴式工頻電場測量儀的研制
        路過濟寧(組詩)
        唐山文學(2016年11期)2016-03-20 15:25:52
        亚洲av中文无码乱人伦在线咪咕| 人妻少妇喷水意淫诱惑| 精品黄色一区二区三区| 亚洲最近中文字幕在线| 97人伦色伦成人免费视频| 亚洲av无码精品色午夜在线观看| 亚洲AV成人无码久久精品老人| 久热爱精品视频在线观看久爱| 国产精品久久久精品三级18| 人妻蜜桃日产一本久道综合在线 | www夜插内射视频网站| 精品国产三级a∨在线| 国产精品美女一区二区三区 | 亚洲av老熟女一区二区三区 | 亚洲视频在线观看青青草| 久久麻传媒亚洲av国产| 亚洲av中文无码乱人伦下载| 熟妇的荡欲色综合亚洲| 久久狠狠第一麻豆婷婷天天| 无码成年性午夜免费网站蜜蜂| 国产一区二区熟女精品免费| 中文无码人妻有码人妻中文字幕| 成年无码av片在线| 成人国产午夜在线视频| 精品国产迪丽热巴在线| 男人天堂亚洲一区二区| 激情内射人妻1区2区3区| 亚洲人成影院在线观看| 日韩高清毛片| 美腿丝袜美腿国产在线| 日本一区二区三区视频免费在线| 中文 在线 日韩 亚洲 欧美| 精品国产午夜福利在线观看| 淫妇日韩中文字幕在线| 人妻经典中文字幕av| 色哟哟最新在线观看入口| 日日碰狠狠添天天爽超碰97| 日本香蕉久久一区二区视频| 国产免费一区二区三区在线观看 | 少妇被又大又粗又爽毛片 | 久久人人做人人妻人人玩精|