        Design of the Control Circuit of C523 Vertical Lathe on PLC

        2014-09-14 07:24:05CUIXiumin
        關(guān)鍵詞:金發(fā)

        CUI Xiumin

        (Shenyang Ligong University,Shenyang 110159,China)

        Design of the Control Circuit of C523 Vertical Lathe on PLC

        CUI Xiumin

        (Shenyang Ligong University,Shenyang 110159,China)

        C523 vertical lathe control circuit uses a relay control method,which has some disadvantages including large size,complex wiring,high failure rate,and maintenance difficulties.To solve these problems,a C523 vertical lathe control circuit based on PLC is designed.The electronic requirements of the control circuits,basis of PLC selection,the hardware connection and software design are described.It has been found that the PLC control circuit is simple,reliable and can highly improve the production efficiency.

        PLC;vertical lathe;control program

        C523 vertical lathe has a rather large size,and its control circuit is more complicated than that of the general lathe,using relay logic control method.This traditional relay control system requires a large number of intermediate relays,time relays,switches and other electrical components.Besides,to achieve interlock and linkage often needs several relays to control,taking up much space.The relays,moreover,are to be connected by wires,whose contact lines and the connection terminals are very dense.Also,the time delay of the time relay is often not very accurate,making the timing difficult.All these increase the probability of failure,and add difficulties to maintenance.And after some years of using,the electrical control system will become aged,the relay malfunctions appear frequently.The PLC is a good solution to transform the traditional relay control circuit.PLC is a product adapting computer technology to the field of industrial control.It has become one of the main pillars of modern industrial automation technology;it combines many advantages including high reliability,strong anti-interference ability,generality,and simple to program,easy t se,strong function,small size and low power consumption.Therefore,here we this Omron CP1H type PLC to re-design the electronic control system.

        1 THE ELECTRICAL CONTROL REQUIREMENTS OF C523 VERTICAL LATHE

        C523 vertical lathe is dragged by six sets of three-phase asynchronous motors,powered by a 380,50Hz power supply.The control circuit is powered by the step-down transformer TC 380V/27V show in figure 1.W1 is the pump motor.When the lubrication indicator on the panel lights up,show in figure 2,the spindle motor has changed form the original.

        Y-Δ start to variable-frequency start.Spindle motor requires forward/reversal rotation.W2 is crossbeam elevator,W3 is crossbeam clamp motor,W4 is left vertical high-speed motor,W5 is right vertical high-speed motor,and W6 is the side motor.

        Figure 1 Control system circuit

        Figure 2 Control panel diagram

        2 RECONSTRUCTION OF C523 VERTICAL LATHE ELECTRICAL CONTROL PLC

        According to the working process of C523 vertical lathe and the electrical parameters of the existing relay control,we considered to take all the buttons,limit switches,change-over switches and other components as input elements of the PLC,and all contactor coil load as the output control object of the PLC.When connecting PLC output port,there was a total of 63 input and output points,so CPM2AH-60CDF-A programmable controller was chosen for reconstruction,having fewer load power types.First,ensure that the original control function remain the same,try to retain the original electrical components,do not add new elements,keep the main circuit and the transformer unchanged,all buttons and limit switches are connected to normally open contacts,thermal relays are connected to normally closed contacts;PLC power supply voltage is AC220V,electromagnetic clutch and brake power is DC 24V,the output port using the relay output.

        During reconstruction,the main measures adopted were as followed:

        1)All the original circuit relays were replaced by auxiliary relays of the PLC,greatly reducing the number of loads,thus simplify the line.

        2)The power-delay time relays were replaced by PLC logic element timers,power-off delay time relays were achieved by using power-off pulse trigger mode and a certain algorithm,making the reliability of the system greatly improved.

        3)Those output components,having interlock relationships on the hardware,were interlocked at the circuit output port connection to avoid causing a short circuit while energized.Although other electromagnetic clutches also had contrary motion transmissions,but even being energized simultaneously,the device wouldn′t be damaged in a short time,so no interlock was needed.

        4)An electromagnetic clutch is a typical mutual inductance load.Its power is huge(relative to other relay elements),and it is likely to cause great impact on the output port,affecting the life of the PLC.Therefore the PLC is not directly connected to the output port.Instead,it is controlled via an intermediate relay.That is,the intermediate relay is controlled by the PLC in accordance with the control logic.When the relay coil is energized,the contactor turns on an action,closes the electromagnet circuit.24V power supply for the electromagnet directly,with no need of the output port of the PLC.The PLC electric ports are shown in Figure 3.

        Figure 3 PLC Control Schematic

        3 PLC CONTROL SYSTEM ANALYSIS OF C523 VERTICAL LATHE

        C523 vertical lathe control system uses digital inputs and outputs,which can be met by a general relay output type.Here are choosing CPM2AH-60CDF-A,whose input and output points have a 20%reserved amount.

        CPM2AH-60CDF-A with the overall structure,compact and fully functional,dramatically improves the space utilization.Although it a miniature type,its speed and processing capability have been much higher than the common miniature PLC,and therefore have obvious performance advantages.Its basic processing time per instruction is only 0.1μs.In order shorten the cycle time,you can use“change the unexecuted task to standby”or“will not perform the procedure area jump into the JMP-JME instruction”approach.CPM2AH-60CDF-A is equipped with two serial communication interfaces(RS-232C and RS-485),making it easy to communicate with the computer when connect to PT,various components(inverter,thermostats and smart sensors,etc.),and other PLC at the same time.

        4 HARDWARE DESIGN OF THE CONTROL SYSTEM

        According to the original lathe operating habits,the operating panel shown in Figure 2 will still be installed on the lift-type pushbutton station to achieve centralized control of the lathe.The control cabinet is installed in the box behind the column.Press the start button,when the control lubrication indicator lights up,press the frequency conversion start button.If operating normally,the inverter running will light up;press the frequency conversion start button.If operating normally,the inverter running will light up,and frequency display window will show the current frequency.Select the appropriate button,according to requirements of certain work piece.

        5 WORK TABLE MOTOR CONTROL

        Work table has four operation modes:forward,reverse,punctuality,anti point.Press the “start pump” button in Figure 2,and the corresponding input contact 0.00 is ON in Figure 3,the auxiliary relay 16.00 is switched on.When indicator light of lubrication in Figure 2 is on,Press the start button of “start frequency conversion”,and the frequency conversion input contact 0.03 in Figure 4 is on,the output coil 100.07 is on,the motor W1 works.

        Contact 0.04 is the forward inching input,0.05 is the backward inching input,0.06 is the forward input,and 0.07 is the converse input.Press the corresponding button on the control panel in fig 2 to start work.Forward and converse circuits are interlocked.

        Figure 4 Work table ladder

        Figure 5 Beam lifting ladder

        Figure 6 Tool heads ladder

        6 BEAM LIFTING CONTROL

        When the beam lifting button is pressed,input contact 0.01 is on,as is shown in fig 5,auxiliary relay coil 16.01 is on,making the beam free relay coil 100.02 on.The beam is free from the clamp system,in preparation of beam lifting.Because the beam free travel switch is pressed,contact 0.03 is on,coil 100.0 is on,and the motor W2 turns forward.The beam is lifted through transmission mechanism.When the beam reaches the upper limit travel switch,contact 0.04 is off,coil 100.00 is off,and the motor W2 stops.At this time,because the upper limit travel switch is still pressed,contact 0.03 is on,coil 100.03 is on,and the motor W2 turns inversely.The beam is fastened at certain location through transmission mechanism.

        If button 0.02 is pressed,the beam will going down,the whole process is similar to the beam lifting.The ladder diagram is showed in Fig.4.Its working control logic can meet the requirement.

        7 TOOL HEAD MOTOR CONTROL

        Tool heads includes left,right,and side head.Their motion adjustments are droved by motor W4,W5 and W6 respectively.Their motions are transmitted by connecting electromagnet with different electromagnetic clutches.Transmission mechanisms of different directions close,achieving motion transmissions of up and down,left and right.In the transformation process,the time relay KT is replaced by the PLC logic elements T(timer),and the direction control relay is replaced by auxiliary relay,greatly reducing the output points.The specific ladder diagram is shown in Figure 6.Take the left turret for an example to explain the working process.

        To move the vertical turret up,turn on 0.03.Coil 16.01 is on,coil 100.05 is on,and the vertical turret moves up.To move the vertical turret quickly,turn on 0.05.Coil 100.03 is on,and the vertical turret moves quickly.When the vertical turret stops working,start timing.After 10 seconds,the control circuit breaks completely.When the turret is working,it will produce a huge mount of energy.To expand the life of the lathe,use timer to release the energy in the lathe.The processes of turret moving down,left and right are similar to this process.

        8 CONTROL EFFECT

        Here we use the CX-P developed by Omron.CX-P has function like ladder programming,monitoring and control,etc.The program design optimizes the original control order of the circuit-control relay.By using statements such as keep,the executive steps are reduced and the cycle shortened.Its control effect is shown in Table 1.

        9 CONCLUSION

        The C523 vertical lathe control lathe control system with the application of PLC meets the requirements of system control,it is simple,reliable,and has strong anti-interference ability,adjustable parameters,small size,low power consumption,low noise,a number of other advantages.It will solve the traditional relay-contactor′s problem of complex system circuit,poor system stability and low efficiency.

        Table1PLCperformancecontrastbeforeandafterreconstruction

        BeforereconstructionAfterreconstructionCuttingvolume/mm0135018Forwardcuttingcurrent/A4435Reversecurrent/A2415Commutationcurrent/A7755Cuttingspeed/(m·min-1)1526Reversespeed/(m·min-1)3645

        [1]Feifei YAN,Chun SHI,Gang WU,et al.Application of CP1H and NT5Z Screen on plane tractor[J].Machine tool & Hydranlics,2010,38(14):296-298.

        [2]Xiyuan LAN,Xiaoyan WANG.Research of PLC′s control Methods for Z3040 driling Machines Simulative Circuit[J].Mico-computer information,2010,26(5-1):147-149.

        [3]Zheng HUO,Xiaobing FAN.OMRON CP1HPLC application & practice [M].Beijing:Machinery Industry Press,2011.

        [4]Ball K.PLC I/O systems news,views,and networks[J].Control Engineering Practice,2007,(17):1398-1404.

        [5]Dangelo,J.Carlos.Performance Models of PLC System for Load Management[D].Pittsburgh:Carnegie Mellon University,2008.

        [6]D.W.Russell.Application of PLC′s as front-end pre-processors in factory information systems[J].The International Journal of Advanced Manufacturing Technology,2009,(42):1052-1061.

        馬金發(fā))

        date: 2013-12-11

        Biography: CUI Xiumin(1965—),female,senior technician,Research direction:electronic design automation.

        1003-1251(2014)05-0085-05

        TP393DocumentcodeA

        猜你喜歡
        金發(fā)
        Angle-resolved spectra of the direct above-threshold ionization of diatomic molecule in IR+XUV laser fields?
        誰(shuí)喝光了我的湯
        College Teaching Quality Evaluation Model and Implementation
        The Application and Simulation of Fuzzy Adaptive PID in Household Heating Metering System
        Research on Orbit Formation and Stability Control Based on High Orbit
        Research on Synchronization Technology of DSSS Signal Based on UQPSK
        Research of the Visualization Temperature Field of the Communication Room Based on the Reconstruction of Three-dimensional Temperature Field
        Study on Image-denoising of Liquid Column in Investment Casting Auto-pouring System
        Fault Diagnosis of Analog Circuit Based on PSO and BP Neural Network
        Research on Wind Power Prediction Modeling Based on Adaptive Feature Entropy Fuzzy Clustering
        亚洲人成无码网站在线观看| 成年女人午夜特黄特色毛片免 | 久久国产精品免费久久久| 日本亚洲中文字幕一区| 精品无码一区二区三区爱欲| 免费看黄视频亚洲网站 | 日韩在线视精品在亚洲| 99久久国产一区二区三区| 精品亚洲乱码一区二区三区| 亚洲自偷自拍另类第一页| 日本国产精品久久一线| 久久精品熟女亚洲av麻| 夫妻免费无码v看片| 成人区人妻精品一区二区不卡网站| 国产国拍精品av在线观看按摩| 日韩精品无码区免费专区| 中文字幕日韩熟女av| 日本老熟妇五十路一区二区三区 | 国产一区二区丰满熟女人妻| 少妇高潮太爽了免费网站| 国产一区二区三区中出| 水野优香中文字幕av网站| 国产男女无遮挡猛进猛出| 日本55丰满熟妇厨房伦| 国产av专区一区二区三区| 色老板在线免费观看视频日麻批| 日韩极品视频免费观看| 精品免费国产一区二区三区四区| 亚洲国产另类精品| 91热久久免费精品99| 亚洲国产综合久久精品| 久久精品亚洲熟女av蜜謦| 中文字幕人妻熟女人妻| 人妻少妇av中文字幕乱码| 欧美日韩一区二区三区视频在线观看| 亚洲双色视频在线观看| 日本人妻系列中文字幕| 99在线精品视频在线观看| 亚洲 精品 综合 精品 自拍| 欧美午夜精品久久久久久浪潮| 亚洲精品一区网站在线观看|