亚洲免费av电影一区二区三区,日韩爱爱视频,51精品视频一区二区三区,91视频爱爱,日韩欧美在线播放视频,中文字幕少妇AV,亚洲电影中文字幕,久久久久亚洲av成人网址,久久综合视频网站,国产在线不卡免费播放

        ?

        Design and realization of signal acquisition digital system for leak detection of water supply pipeline*

        2014-07-31 20:22:31HongliLYUCuiyingDONG
        機床與液壓 2014年2期
        關(guān)鍵詞:供水管唐山低功耗

        Hong-li LYU, Cui-ying DONG

        Department of Information Engineering, Tangshan College, Tangshan 063000, China

        Design and realization of signal acquisition digital system for leak detection of water supply pipeline*

        Hong-li LYU?, Cui-ying DONG

        DepartmentofInformationEngineering,TangshanCollege,Tangshan063000,China

        Since the leakage signals have some characteristics such as low amplitude and wide dynamic range, it is difficult to catch these signals in the real industrial applications. In this paper, a leakage signal acquisition system, which has some unique characteristics such as low noise, low power consumption and easy to be adjusted according to the practical settings, is analyzed and designed. Based on the SCM, this system is capable for signal acquisition and data communication with DSP. It could satisfy the requirements of leak detection and data acquisition in outdoor long-distance operation mode.

        Leak detection, Signal adjust circuit, Data acquisition, RS-485, SCM

        1.Introduction

        As far as urban water supply system is concerned in our country, the leakage of water supply pipeline could cause serious water loss at each year[1]. Therefore, how to develop the instruments for pipeline to monitor and position the leakage is a new promising research subject. Since the data used to detect the pipeline leakage have a direct impact on the leakage position accuracy for the pipeline, the data acquisition system becomes very important to determine the leakage position of pipeline[2-4].

        2.Theory of correlation detection of pipeline leakage

        The schematic diagram of correlation detection is shown in Figure 1[5-6]. The leakage signal travels in two directions with the velocityv. The symbolL1andL2stand for the distance from 1# and 2# sensor to the leakage position. The time difference of the signal arrival the two sensors is called time delay and is symbolizedD. The distance between the two consecutive sensors is symbolized asL. According to the similarity of the two signals, the peak value of correlation function could be obtained and the time delayDcould be evaluated and then the leakage position could be is determined. The distance from leakage position to 1# sensor isL1and it could satisfy the following formula.

        Figure 1. The principle of correlation detection

        3.Control scheme for signal acquisition system

        Due to the different material of pipeline, diameter of pipeline and shape of leakage position, the frequency distribution of leakage signal could vary in a relative big range. The frequency range of water leakage sound signals for the metal pipeline is from 500 Hz to 3 500 Hz[7]. Since the water leakage signal is transmitted through soil to ground, the amplitude of this signal could be decreased. Based on the on-site field measurement, the frequency range of leakage sound is always between 100 Hz and 700 Hz which could be detected from the ground. Therefore, the accelerometer is needed in the system to measure the vibration signal. According to the principle of correlation detection, the signal acquisition system should simultaneously obtain these two signals.

        Since the obtained signals from the two sensors are weakened and there exist some noise signals, the signal adjustment circuit is designed to amplify and filter the noise signals. And then the signals will be converted into digital signals through the A/D chip and these digital signals could be saved by single-chip microcontroller (SCM). Because there exist some distance between the consecutive two sensors and various signals are stored by the main SCM, the data transmission is necessary and it is selected as RS-485. In order to obtain the real-time analysis for this system, a DSP chip is adopted to realize the complex algorithm for correlation detection theory and the RS-485 is used for the data transmission between the main SCM and DSP. The control scheme diagram for signal acquisition system is shown in Figure 2.

        Figure 2. The system control scheme diagram

        4.Design of the signal adjustment circuit

        The signal adjustment circuit consists of amplification circuit and filter circuit.

        4.1.Design of the signal amplification circuit

        The leakage signal has relatively high dynamic range and is seriously affected by the outside environment. If the fixed-gain amplifier is adopted for the signal acquisition system, there exist some problems for the signals such as insufficient amplification or saturated amplification. Therefore, the adjustable-gain amplifier should be selected and the dynamic gain range is between 0 dB and 32 dB. As shown in Figure 3, it is presented the signal amplification circuit with the chip NE5532, and the gain of this circuit could be adjusted by modulating the resistance value of R4.

        Figure 3. Signal amplifying circuit with NE5532

        4.2.Design of the signal filter circuit

        The maximum limit of high frequency components for leakage signal is 3 500 Hz and the frequency bandwidth of noise is relatively wide, therefore the low pass filter is needed for the design of the filter circuit. Since the elliptic filter is one of the low pass filters and it has the minimal pass-band and stop-band ripple as compared with other filters, this kind of filer is adopted in this paper. As shown in Figure 4, the elliptic filter circuit with chip LTC1068 is presented and the cut-off frequency is 3 500 Hz and the pass-band gain is 0 dB.

        Figure 4. Signal filtering circuit

        4.3.Hardware design for low noise and low power consumption

        The signal amplification circuit could magnify the output signal of the sensor; however, at the same time the noise could be produced. In order to control the noise signal and prevent the signal pollution during the amplification process, the low noise components is selected for the circuit design, such as metal film resistor, field-effect tube, Rail-to-Rail device for integrated operational amplifier.

        In order to adapt to the water pipeline leakage detection of outdoor working environment, the signal acquisition system is needed to be powered by a battery. Therefore, the system has the requirement for the low power consumption. Due to this reason, the SCM is selected to be the processor because it has relatively low power consumption characteristics as compared with other embedded processors. In addition, the low power devices meet the requirements for the design of the peripheral circuit and Lithium- ion battery of high energy density could be used in the real industrial applications.

        5.Software design

        After power on and initialization, the two SCM will wait for the instructions from the main SCM through RS-485 bus. Once the data acquisition instruction is received, the A/D chip will get started and the leakage signals could be obtained and saved. The saved data will be transmitted to DSP through RS-485 bus. The program flow chart of main SCM is illustrated in Figure 5.

        Figure 5. Program flow chart of data acquisition system

        6.Conclusion

        The leakage signals are simulated by signal generator and the peak-to-peak voltage amplitude is 500 mV and frequency is 1000 Hz. These signals will be adopted as the input signals for the signal adjustment circuit. The peak-to-peak voltage amplitude of output signals from adjustment circuit is 4 V. As shown in Figure 6, it is presented the input and output simulated waveforms for signal adjustment circuit. This demonstrates that the magnification factor of signal amplification circuit is eight.

        Figure 6. The input and output simulated waveform of signal adjust circuit

        Figure 7 is the model machine of signal acquisition system and Figure 8 is the waveform recorded in the field testing for water pipeline leakage. The data stored in SCM is transmitted to DSP by RS-485 and the complex filtering algorithm and localization algorithm are achieved by DSP.

        Figure 7. The signal acquisition system prototype

        Figure 8. The waveform recorded in the field testing

        The designed leakage signal acquisition system has low noise and low power consumption. It is capable to match the outdoor working environment for leakage detection and could be applied to the petroleum, gas or other pipelines.

        [1] Qian Yi,Liu Changming.Sustainable development of water resource in Chinese urban[M].Beijing: China Water Power Press,2002.

        [2] Wang Ji-hua,Peng Zhen-bin,Guan Xiang-feng.Leakage testing techniques and prospect for ductwork of water supply[J].Journal of Guilin institute of technology,2004,24(4):456-460.

        [3] Pilcher R,Hamilton S,Chapman H,et al.Leakage location & repair guidance notes version 1[J].Water Loss Task Force,IWA.2007(3):12-18.

        [4] Shu Shi-hu,He Wen-jie,et al.Current Application and Recent Development of Leakage Detection Technologies in Water Supply Networks[J].Journal of water & wastewater engineering,2008,34(6):114-116.

        [5] Brennan M J,Gao Y,Joseph P F.On the relationship between time and frequency domain methods in time delay estimation for leak detection in water distribution pipes[J].Journal of Sound and Vibtation,2007,304:213-223.

        [6] Gao Y,Brennan M J,Joseph P F,et al.On the selection of acoustic/vibration sensors for leak detection in plastic water pipes[J].Journal of Sound and Vibtation,2005,283:927-941.

        [7] Feng Ying-jian.Research on leakage detection system of city water pipeline[D].Shenyang: Shenyagn University of Technology,2008.

        供水管道泄漏信號采集系統(tǒng)的設(shè)計與實現(xiàn)*

        呂宏麗?, 董翠英

        唐山學(xué)院 信息工程系, 河北 唐山 063000

        針對供水管道泄漏信號幅度低、動態(tài)范圍大的特點,設(shè)計了管道泄漏信號采集系統(tǒng)。該系統(tǒng)具有低噪聲、低功耗特性,而且采集參數(shù)動態(tài)可調(diào)。系統(tǒng)實現(xiàn)以單片機為核心,完成了數(shù)據(jù)采集并實現(xiàn)與DSP的數(shù)據(jù)通信,能夠滿足戶外長距離管道泄漏信號數(shù)據(jù)采集的要求。

        泄漏檢測;信號調(diào)理電路;數(shù)據(jù)采集;RS-485;單片機

        TP274

        2014-03-01

        10.3969/j.issn.1001-3881.2014.12.018

        *Project supported by Science and Technology Support Program of Hebei Province(13276201D)

        ? Hong-li LYU, Associate professor. E-mail: LHL741127@163.com

        猜你喜歡
        供水管唐山低功耗
        二次供水管道漏損預(yù)警方法的分析和選擇
        市政工程供水管網(wǎng)運行管理
        中國農(nóng)業(yè)發(fā)展銀行唐山分行
        一種高速低功耗比較器設(shè)計
        桂林市供水管網(wǎng)在線水力模型的建立與應(yīng)用初探
        唐山香酥饹馇圈
        王大根
        把唐山打造成為國家級節(jié)能環(huán)保產(chǎn)業(yè)基地
        用EPANET確定供水管網(wǎng)的最不利配水點
        ADI推出三款超低功耗多通道ADC
        中文字幕一区久久精品| 亚洲爆乳大丰满无码专区| 国产美女亚洲精品一区| 国产高潮迭起久久av| 国产色欲av一区二区三区| 亚洲粉嫩高潮的18p| 97精品国产高清自在线看超 | av网站一区二区三区| 亚洲综合av一区二区三区蜜桃 | 亚洲av成人精品日韩一区| 成年视频网站在线观看777 | 激情内射亚洲一区二区| 日本a级免费大片网站| 国产成人av一区二区三区| 香蕉成人啪国产精品视频综合网 | 高清偷自拍第1页| 日韩女人毛片在线播放| 国产精品女丝袜白丝袜美腿| 亚洲欧洲成人精品香蕉网| 99久久久无码国产精品免费砚床| 国产精品欧美视频另类专区| 按摩师玩弄少妇到高潮av| 国产精品激情| 真实国产乱视频国语| 人妻中文字幕一区二区三区| 免费国产线观看免费观看| 波多野结衣中文字幕久久 | 亚洲香蕉久久一区二区| 男人扒开女人双腿猛进视频| 国产山东熟女48嗷嗷叫| 国产爆乳美女娇喘呻吟久久| 国产自产二区三区精品| 国产三级精品三级在线观看| 久久水蜜桃亚洲av无码精品麻豆| 女人天堂国产精品资源麻豆| 亚洲精品~无码抽插| 亚洲精品国产美女久久久| 黄色三级国产在线观看| 国产精品无码一区二区三级| 宝贝把腿张开我要添你下边动态图| 日韩精品一区二区三区中文9|