        ExpertForum

        Views on Key Technical Issues of Construction of Taiwan Strait Tunnel

        SUNJun(No.1-1)

        Tunneling by TBM/shield in China: State-of-art,Problems and Proposals

        WANGMengshu(No.3-179)

        Development and Application of Construction Technologies for Underground Water-sealed Energy Storage Caverns

        HONGKairong(No.3-188)

        Challenges and Prospectives of Construction of Long-distance Inclined Shafts of Coal Mines by Shield/TBM

        HEChuan(No.4-287)

        Reform of Investment and Financing System of Infrastructures in Mainland China: Experience from TOD of Urban Rail Transit Works

        ZHUXiaobing(No.5-397)

        Challenges in Construction of Underwater Tunnels and Countermeasures

        QIANQihu(No.6-503)

        Prospects on New Technologies of Super-large Diameter Shield Machine for Qiongzhou Strait Tunnel

        CHENKui(No.7-603)

        Countermeasures for Deep and Thick Soft Foundation under Serious Back-silting Condition: Case Study on Artificial Island and Immersed Tunnel of Hong Kong-Zhuhai-Macao Bridge Project

        SUNJun(No.9-807)

        Environment Issues of Tunnels and Their Countermeasures

        GUOShanyun(No.9-815)

        Promoting TBM in Tunnel Construction in China

        QIMengxue(No.11-1019)

        Research

        Experiment on Mechanical Property of Straight-wall Semicircle-arch Concrete-filled Steel Tube Support and its Application

        GAOYanfa,WANGJun,HUANGWanpeng,CHENBinghui,WANGLiang,WANGChao(No.1-6)

        Highway Tunnel Surrounding Rock Deformation Prediction Model Based on Support Vector Machine Optimized by Ant Colony Optimization and Its Application

        QIUZhigang(No.1-13)

        Georobot-based Automatic Deformation Monitoring in Tunnel Construction

        FANBen,ZHENGJiqiang,ZHUKundian(No.1-19)

        Study on Rapid-hardening High-performance Simultaneous Grouting Material for Shield-bored Tunnels

        XUJianping,LINWenshu,XUKe,LINJianping,WANGBiao,MIAOQiang,DingQingjun(No.2-95)

        Study on Ground Penetrating Shield-bored Tunnel Calculation Parameters in Modified Routine Method

        ZHANGYinping(No.2-101)

        Study on Water-tightness and Pumpability of Shield Tail Sealing Grease

        WANGDeqian(No.2-107)

        Mixing Proportion of and Key Construction Technologies for Extruded Concrete Lining of Utility Tunnels

        LIWenjun(No.2-111)

        Study on Influence of Excavation of Foundation Pit on Deformation of Underlying Tunnel in Complex Ground

        ZHAOJun,GANPenglu,SHENWenming,LIUWei(No.2-118)

        Analysis on Cost of Shield Boring across Hard Rocks

        SHILiu,LIGuangtao(No.2-124)

        Study on Instability of Excavation of Deep Tunnels Considering Disturbance Action of Vibration

        LVXiangfeng(No.2-129)

        Application of Wireless Sensor Network Technology in Tunnel Deformation Monitoring and Disaster Prevention

        JIZhong(No.2-134)

        Comparison and Contrast between TGP206 and TSP203 Advance Geology Prediction System: Advantages of TGP206

        LIUYunzhen(No.3-198)

        Development of Additives Dedicated for Preparing High-performance Simultaneous Grouting Material

        ZHOUShaodong,LINWenshu,WANGHongxi,XUKe,LINJianping,WANGBiao,DINGQingjun(No.3-205)

        Study on Control of Hot and Humid Environment in TBM Driving of Zhongtianshan Extra-long Tunnel

        WANGJinzhong(No.3-212)

        Case Study on Structural Safety of Large Cross-section Tailrace Tunnel of Huangjinping Hydropower Station

        YIZerong,YANGChao,WANGYusuo(No.3-216)

        Analysis on Influence on Lining of Existing Railway Tunnel Imposed by Blasting Construction of Water-releasing Tunnel

        KONGJinghua(No.3-221)

        Deformation of and Numerical Analysis on Foundation of Wangjingxi Station on Line 13 of Beijing Metro Caused by Shield Tunneling below

        ZHANGWenzheng(No.3-226)

        Influence of Deformation Joint Spacing on Internal Force of Tunnel under Active Fault Movement

        LIXuefeng,DAIZhiping,GUXueying,CAOZihao(No.3-237)

        Analysis on Application of AHP Method in Selection of Cut-and-Cover Method

        ZHULi,TIANHaiguang,YUANYong(No.3-243)

        Analysis on Cutting-off of Non-fire-fighting Power Supply of Metro Stations

        GUOLi(No.4-298)

        Analysis on Influence of Construction of Deep Foundation Pit on Adjacent Buildings: Case Study on GZH-5 Bid Section of Dongguan-Huizhou Inter-city Rail Transit Project

        WANGKaichun(No.4-303)

        Analysis on Influence of Excavation of Foundation Pit of Municipal Tunnel on Existing Underlying Shield-bored Metro Tunnel

        GAOQiang,YUWenlong(No.4-311)

        Study on Minimum Distance between Centers of Tracks of Main Lines of Urban Rail Transit Works When Single Crossover is Set into Curve

        ZHANGWenzheng,ZHANGZhiya,YINHuatuo,SHILonglong(No.4-318)

        Partial Factor Method for Structure Calculation of Highway Tunnels

        GUOXiaohong,SHUHeng,TUOYongfei(No.5-402)

        Comments on Equipment Selection for Ventilation during Long-distance Dead-end Tunneling

        SUNZhenchuan,GOUHongsong(No.5-408)

        Characteristics of and Suggestions for BT Mode in Metro Construction in China

        ZHUOFacheng,PANWeidong,BAIYun(No.5-413)

        Analysis on Influence of Size Effect on Excavation Stability of Caverns in Jointed Rock Mass

        CHENWenyi,YANGChaoshuai(No.5-418)

        Analysis on Complicated Deep Metro Foundation Pit Supported by Ring Plate Substructures: Case Study on Wangjiadun Center Station on Line 3 of Wuhan Metro

        LIUZhaogang(No.5-423)

        Behavior of Combined Support Structure Consisting of “Large-diameter High-pressure Jet Grouting Piles + Double-row Borehole Cast Piles”

        HUANGJun,CHENFangwei,ZHAOGuang,XINGDongdong,XIAOJunhua(No.6-508)

        Case Study on Engineering Geological Conditions and Problems in Construction of Headrace Tunnel of CCS Hydropower Station in Ecuador by TBM Method

        YANGJihua,QISanhong,GUOWeixin,YANGFengwei,LOUGuochuan(No.6-513)

        Deformation of Uplift Piles and Its Influence on Calculation of Metro Station Structures

        ZHANGYueming(No.6-519)

        Analysis on Construction Safety of Optimized Double Side Drift Method

        GUOJie(No.6-525)

        Research on Shield Boring Attitude Control Based on Fuzzy PID Algorithm

        GONGGuofang,HONGKairong,ZHOUTianyu,HOUDianqing,WANGLintao(No.7-608)

        Roadmap for Metro Owner’s Project Risk Management

        HUHao(No.7-614)

        Analysis on Strength Concept in Uzbekistan Concrete Codes

        CHENHongguang(No.7-619)

        Study on Classification Methods of Surrounding Rock of Underground Powerhouse of CCS Hydropower Station

        YANGJihua,GUOWeixin,QISanhong,ZHANGDangli(No.7-623)

        Structural Seismic Analysis on a3-storey Metro Station with Retaining Walls

        LIUJun,SHENXiaowei(No.7-629)

        Field Test and Analysis on Stress of Lining of Large-Diameter River-crossing Shield Tunnel

        LIANGYu,SUWenhui,FANGLigang,YANGJunsheng(No.7-637)

        Experimental Study on Shear Properties of Interface between Segment of Shield Tunnel and New Composite Structure after Exposure to High Temperature

        YANGCheng,YANZhiguo,ZHUHehua(No.7-642)

        Study on Application of Different Self-adapting Kalman Filtering Methods in Data Processing in Settlement Prediction of Metro Tunnels

        FANLeigang,TIANLinya,CHENXifeng(No.7-649)

        Study on Feasibility of China-Nepal-India Railway Crossing Himalayas

        GUFangfang,SHIZhenming,ZHENGYanlong,BAIYun(No.7-653)

        Study on Range of Pressure on Tunnel Face of Earth Pressure Balanced Shield and Its Influence on Ground Surface Settlement

        GONGQiuming,MOUShanqing,JIANGHouting,LUDechun(No.8-707)

        Analysis on and Optimization of Construction Scheme of Closely-spaced Metro Tunnels with Different Cross-section Dimensions

        DINGGaigai,JIANGHai,KONGXiangxing(No.8-715)

        Study on Boring Parameters of Composite EPB Shield in Sandy Cobble Strata and Study on Ground Deformation Rule

        YANGXiaohua(No.8-721)

        Comparative Simulation Analysis on Applicability of Different Karst Cave Treatment Methods in Tunneling

        ZHANGJianguo(No.8-731)

        Development and Application of New Automatic Traverse Survey Robot

        LVHongquan(No.8-737)

        Application of Multiple Linear Regression Method in Compilation of Norm of Water Pumping in Tunneling

        ZHANGHenghui(No.8-745)

        Engineering Geological Properties of Soft Surrounding Rocks of Mountain-crossing Tunnels and Construction Countermeasures

        ZHANGJianru(No.8-749)

        Analysis on Rigidity of Primary Support of Composite Lining and Its Influencing Factors

        LIChunqing,LIANGQingguo,WUXuyang,SUNKai(No.8-754)

        Study on Blasting Vibration Control of Shallow Tunnel Based on HHT Analysis

        ZOUDechen,WANGHailiang,WANGChunhui,LIChuan(No.8-760)

        Analysis on Causes for and Renovation of Floor Structure of a High-speed Railway Tunnel Located in slightly-dipping Interbedded Rock Mass

        WANGLichuan,XIAOXiaowen,LINHui(No.9-823)

        Static and Dynamic Calculation and Feasibility Analysis of Ningdong Railway Crossing above a Water-conveyance Tunnel

        CHENQiang,LIUFeng,XIANGHuawei,WANGShuguo(No.9-837)

        Study on Waterproofing Joints of Segments in GPST Method

        NINGZuoli(No.9-844)

        Excavation Scheme Comparison and Secondary Support Installation Timing of Highway Tunnel in Water-containing Poorly-cemented Powder-fine Sandstone

        DONGLei,SONGHongyan(No.9-849)

        Experimental Study on Preparation and Filter Membrane Formation of Slurry during Hyperbaric Operation in Tunneling by Slurry Shield

        MINFanlu,JIANGTeng,WEIDaiwei,ZHANGYazhou(No.9-857)

        Survey and Research on Estimation Method of Against-inrush Safe Thickness of Rock Strata in Karst Tunnels

        LIJi,LUHao,XIAYuanpu(No.9-862)

        Field Experimental Study on Characteristics of Surrounding Rock Pressure of Mined Tunnel under Aircraft Dynamic Load

        CHAOKai,TANZhongsheng(No.9-873)

        Analysis on Characteristics of and Causes for Defects of Coal Measure Section of Jiazhuqing Tunnel

        LIUWei(No.10-921)

        Study on Optimization of Parameters of Primary Support of Metro Tunnel

        ZHANGTao(No.10-926)

        Shield Boring of Metro Tunnel Perpendicularly Crossing Underneath Existing Tunnel: Analysis on Influence of Shield Boring on Existing Tunnel

        KANGZuo,DAIGuanghui(No.10-931)

        Comparative Study on Structural Types of GINA Gaskets Used in Immersed Tunnel

        HUZhinan,YANGPeng,SHANChao,RENYuzheng,DANGDing(No.10-937)

        Study on Long-term and Short-term Working Behavior of Composite Wall of Super-deep and Super-large Working Shaft

        LIXiaochun(No.11-1024)

        Study on Strata Deformation Characteristics of Dynamic Construction of Overlapping Shield Tunnels with Different Intersection Angles

        ZHOUJianjun,YANGZhenxing,GUOLu(No.11-1031)

        Application of Parameter-adjustment-based Selecting Weight Iteration Method in Cross-section Monitoring of Metro Works

        HELei,CHENHao,SUIXiuzhen(No.11-1036)

        Feasibility Study and Discussion on Tunnel Excavation by Water Jet Technology

        WANGDong,LIYongsheng,GOUHongsong(No.11-1042)

        Exploration of Zones Disturbed by Metro Construction and Estimation of Grouting Reinforcement Effect

        CHENNing,LIUChao(No.11-1049)

        Study on Control of Ground Surface Settlement: Case Study on Adjacent Tunnel Tubes of Shenzhen Metro

        ZHAOJingjing,SUWenji(No.11-1055)

        Study on and Execution of Large-scale Underground Reinforced Concrete Structure without Expansion Joints: Case Study on Futian Underground Comprehensive Transportation Hub

        LIUKading(No.12-1113)

        Analysis on and Monitoring of Influence of Blasting Vibration of Highway Tunnel on Adjacent Water Conveyance Tunnel

        LIUTuo(No.12-1126)

        Study on Acceleration Mechanism of Liquid Alkali-free Accelerating Components

        HEXiongfei,ZHANGXun(No.12-1131)

        Analysis on Influence of Construction of Mining Tunnel on Nanjing-Hexian Inter-city Railway Crossing Underneath Existing Freight Railway Tunnel

        PENGHongxia,CHENGYunyan,WANGHuaidong(No.12-1137)

        Case Study on Transverse Ground Surface Settlement of Land Section of Shiziyang Tunnel Bored by Shield

        YANGYandong,CHENKui,LIFengyuan,ZHOUJianjun(No.12-1143)

        Study on Cyclic Use of Waste Clay in Preparing Slurry for Slurry Shield Boring

        JIANGTeng,YAOZhanhu,MINFanlu(No.12-1148)

        Planning&Design

        Analysis on Transfer Modes between Existing Double-track Metro Stations of Beijing Metro with Long-term Metro Stations

        SHIGuangyin(No.1-24)

        Case Study on Design of Highway Overcrossing Existing Railway Tunnel

        ZHOUChao(No.1-32)

        Numerical Analysis on Design of Protection Measures for Ancillary Structures of Wangchengpo Metro Station

        WANGLin,TANPeilian,WANGGen(No.1-41)

        Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park

        XIJun,SUNYuanguang(No.1-48)

        Sustainable Development of Underground Space: Case Study on Optimized Design of Anti-floating of Underground Parking Garage of Yitian Village in Shenzhen,China

        LIUKading(No.2-140)

        Design of Qiansanmen Tunnel of Beijing Underground Rail Transit Line Crossing above Existing Metro Connection Gallery and Existing Power Tunnel

        GUOJianyong(No.2-147)

        Design of Support of Deep Foundation Pits in Hard-soft Heterogeneous Ground

        ZHAOWenqiang(No.2-153)

        Design of and Study on Embedded Channels of Segments of Shield-bored Tunnels of Line 9 of Shenzhen Metro

        DUFeng(No.3-249)

        Analysis on Influence of Arrangement Mode of Cooling Towers of Air-conditioning System of Metro Stations on Ground Surface Environment

        LIANGYan,TANGChunhua(No.3-254)

        Experience in Planning and Construction of Suzhou Rail Transit Works

        LIANGChuangjia(No.3-259)

        Case Study on Selection of Proper Retaining Structures for Different Types of Foundation Pits of Nanhulu Xiangjiang River Crossing Tunnel in Changsha,China

        DUANJiandi(No.4-324)

        Design and Construction of Underground Space Formed by Jacking Multiple Adjacent Rectangular Pipes

        LIXiansen(No.4-331)

        Application of Double Side Control Method in Fine-tuning Design of Line Slope of Metro Works

        LIUYanchen(No.4-339)

        Study on Underpinning of Puzhulu Metro Station on Line 3 of Nanjing Metro to Achieve Integral Launching of Large-diameter Shield Machine

        LIUFangming(No.4-343)

        Study on Passenger Transfer Modes of Underground Metro Stations

        LIGepeng(No.5-428)

        Case Study on Design Concept of Chegongmiao Comprehensive Station of Shenzhen Metro

        ZENGLiang,LILu(No.5-443)

        Case Study on Design of Dangjinshan Super-long Tunnel on Dunhuang-Golmud Railway

        LUShiyang(No.5-452)

        Architectural Design of Metro Stations in Downtown Area based on Site Environment

        YAOXiangui(No.5-460)

        Analysis on Influence of Plan Change on Alignment Design of Line 2 of Nanchang Metro

        ZHANGZhiya,LIUKejing(No.5-467)

        Case Study on Design of Commercial Space above Ancillary Routes of Guangzhou Metro

        LUOLiang(No.6-534)

        Study on Key Technologies for Geological Route Selection of Long Tunnels Crossing Spring Protection Zone and Goaf

        ZHOULu(No.6-539)

        Single Double-track Tunnel Tube or Twin Single-track Tunnel Tubes: Case Study on Super-long Yuntunbao Tunnel on Chengdu-Lanzhou Railway

        ZHUYong,WUHua(No.7-661)

        Analysis on Design Ideas for Business Development of Station Halls of Guangzhou Metro

        LUOLiang(No.7-668)

        Study on Use of Surrounded Space and Remaining Space of Cut-and-cover Metro Station

        YAOXiangui(No.9-880)

        Study on Optimization of Design of Mined Running Tunnel Crossing Underneath Large-scale Interchange in Urban Area

        ZHANGJinwei(No.9-887)

        Comprehensive Development and Utilization of Underground Space in Huaqiang North Commercial Area along Line 7 of Shenzhen Metro

        CHENXiangsheng,ZHUYihai(No.10-944)

        Case Study on Influence of Separation Wall on Deformation of Large Cross-section Shield-bored Tunnel on No.16 Line of Shanghai Metro

        ZHANGZhongjie,YEGuanlin,TANGXiang(No.10-953)

        Design Optimization and Construction of Steep Inclined Ventilation Shaft of E’gan Super-long Highway Tunnel

        LIUSuo(No.10-959)

        Key Technologies for Operation Ventilation Design of Road Tunnels Constructed by Shield Method

        ZHANGDi(No.11-1062)

        Countermeasures for Shield Cutting and Passing Underneath Piles of Existing Pedestrian Bridge

        CHUKejun,ZHAOLiang,XUQian(No.11-1071)

        Discussion on Design of Equipotential Bonding in Metro Stations

        GAOTing,LIHongxing(No.11-1077)

        Theory and Practice of Architectural Design of Entrance/Exit of Metro Station

        YAOXiangui(No.12-1153)

        Study on Engineering Geological Characteristics of Tertiary Strata of Zhongtiaoshan Tunnel on Menghua Railway

        QINZhenggui,CHENYong(No.12-1163)

        ConstructionTechnology

        New Technologies Applied in Design and Construction of Shanghai Metro Works

        BAITinghui(No.1-53)

        Key Technologies Applied in Design and Construction of Artificial Islands and Immersed Tunnel of Hong Kong-Zhuhai-Macau Bridge (HZMB) Project

        YINHaiqing(No.1-60)

        Case Study on Ground Penetrating Shield Technology (GPST)

        WUHuiming,ZHOUWenbo,TENGLi(No.1-67)

        Key Points in Implementation of Bonded Circumferential Pre-stressing of Yellow River Crossing Tunnel on South-to-North Water Diversion Project

        SUNZhenchuan,ZHONGShengxing(No.1-73)

        Deformation Monitoring Technology for Deep Surrounding Rocks of Soil Tunnels Based on BOTDR

        YINLong,WANGXiaolin(No.2-158)

        Construction Survey of Tanba No.4 Spiral Tunnel on Xiaohe-Ankang Highway

        NIUChunxia(No.2-163)

        Analysis on and Control of Ground Surface Settlement:Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Top-down Construction Method under Protection of Cast-in-situ Arch

        LIChunkui(No.3-264)

        Design and Construction of Heat-keeping Water-proofing and Drainage System of Lafashan Tunnel in Extremely Cold Region

        YUESheng,YANGChunbo,YANGYanling(No.3-269)

        Tunneling by EPB Shield in Gravel Strata: Case Study on Line 4 of Chengdu Metro

        FENGHuanhuan,YANGShujiang(No.3-274)

        Hydropower Tunnel in High Geothermal Condition: Influences of High Ground Temperature and Countermeasures

        SUHui,ZHANGHong,GENGXinchun,TANGYang,WANGJian(No.4-351)

        Comments on Distance between Primary Support/Secondary Lining and Working Face of Inter-city Underground Railway Tunnels

        NIEZhenyu(No.4-356)

        Case Study on Installation of Shaped Steel Columns in High-strength Rocks in Construction of Chegongmiao Station of Line 11 of Shenzhen Metro

        CHENYu,LIHailong(No.4-362)

        Application of Automatic Monitoring Technology in Construction of Shield-bored Metro Tunnel Crossing Underneath High-speed Railway in Urban Area

        LIMing(No.4-368)

        Key Construction Technologies for Shield-bored Tunnel of Chegongmiao Station-Hongshuwan Station Section on No.11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line

        LIJianshe,CHENHuichao,LIZheng(No.4-374)

        Model Test on Concrete Cutting Directly by Shield and Pile Foundation Cutting Technology

        FUDeming(No.5-472)

        Discussion on Blasting Excavation Sequence of Closely-spaced Stacked Tunnels in Medium-thick Layered Rocks: Case Study on Dalongshan-Huahuiyuan Running Tunnel on Line 6 of Chongqing Metro

        CAIZhenyu,HUANGXu(No.5-478)

        Tunneling through Water-rich Fractured Zone with Super-high Water Pressure: Case Study on Zhongtianshan Tunnel

        WEIWenjie(No.5-484)

        Analysis on Abnormal Data in TGP Advance Geological Prediction in Tunneling and Countermeasures

        WEIJunke,ZHAOShaoqiang,CHENTao,LIUJianguo(No.5-489)

        Anchoring Cable Removing Technology: Case Study on Hui-Min Shield-bored Tunnel on Line 1 of Zhengzhou Metro

        LIGuangliang(No.5-494)

        Case Study on Consolidation of Water-rich Cobble Ground in Nanning by means of Soletanche Grouting

        WEIChenliang,WANGYuqing,TANGGaohong(No.5-499)

        Technologies to Control Serious Deformation of Soft Rocks with High Ground Stress: Case Study on Liangshui Tunnel on Lanzhou-Chongqing Railway

        ZHAOFushan(No.6-546)

        Problems and Countermeasures in Tunneling by Open TBM in Chongqing Rail Transit Works

        ZHANGZhiyong,GUANZhipeng,CHENXiaoping,LIUYongsheng(No.6-554)

        Case Study on Blasting and Control Technologies for High Road Channel in Ningguo-Jixi Section on Yangzhou-Jixi Expressway Adjacent to Existing Railway Line

        DONGLei,TANGDaoyi(No.6-558)

        Case Study on Parallel Cut in Vibration-reducing Blasting of Hard Rock Tunnel in Urban Area

        WANGJuntao,WANGHailiang,YANGQing(No.6-564)

        Measures to Ensure Rapid Boring of Open TBM Based on “4M+1E” Factors

        XUZan,XIEPeicai(No.6-569)

        Research on and Application of Technologies for Cutting Tool Replacement under Hyperbaric Condition in Super-large Diameter Slurry Shield Boring

        WUZhongshan,YANGZhao,YANGQing(No.7-673)

        Technology for Deformation Control of Sujiachuan Large Cross-section Loess Tunnel on Baoji-Lanzhou Railway Constructed by Top Heading and Two-Bench Method

        XIHao,LIXugan,SHIJian,HOUQi(No.7-679)

        Technologies for Double-shell Support of Tunnels in Soft Rock with Extra-high Ground Stress

        SIJianjun(No.7-685)

        Measures to Improve Effect of Tunnel Lining Testing by means of Ground Penetrating Radar

        ZHANGJiaming(No.7-691)

        Treatment of Water Leakage and Freezing of an Operating Railway Tunnel on Ji’ning-Baotou Railway in Plateau and Extremely Cold Region

        PANHonggui,WANGZhijie,LIBo,XUCaizhang,QIUYue,GAOFei(No.7-696)

        Shield Tunneling Technologies for Xiamen Metro under Complex Geological Conditions

        YANGShujiang(No.8-765)

        Shield Docking Technologies for Shiziyang Tunnel

        DUChuangdong(No.8-771)

        Construction Technologies for Shield-bored Tunnel Crossing underneath Chuanshan Interchange

        JIAGuangwu(No.8-778)

        Automatic Water Pumping Technology for Inclined Shafts: Case Study on No.5 Inclined Shaft of Guanjiao Tunnel

        NIUHongpei(No.8-784)

        Shield Launching Technology for Running Tunnel on Small-radius Curve with One Single Shaft: Case Study on Line 2 of Dalian Metro

        JIWeiguo(No.9-895)

        Technology for Supporting Consisting of Systematic Bolts and Steel Arches Applied in Construction of Ingate and Junction Section between Ventilation Tunnel and Main Body of Metro Station

        YANGHongshe(No.9-900)

        Key Technologies for Rapid Construction of Baidian Tunnel in Tertiary Water-rich Sand Strata

        GAOGuangyi(No.9-908)

        Numerical Analysis on and Construction Technologies for Underpinning of Existing Underground Commercial Mall on Museum Station-Longjiang Street Station Section of Harbin Metro

        DONGDaohai(No.10-967)

        Study on Consolidation of Tunnel in Highly-permeable Sandy-gravel Strata by means of Ground Surface Soletanche Grouting

        ZHANGMing(No.10-975)

        Case Study on Treatment of Pile Foundations Encountered in Construction of Shield-bored Metro Tunnel

        HEMaozhou(No.10-981)

        Design and Application of On-line Monitoring System and Assessment on Safety of Ground Surface Buildings (Structures) in Metro Construction

        LIZhihui,LIUWeijing,LIUWenfeng,GUOXingling,YANGPeng(No.10-990)

        Analysis on Conditions for Rapid Boring of Single-shield TBM

        YANGBin(No.10-997)

        Study on Construction Scheme of Xinzhou Tunnel Crossing Underneath Datong-Yuncheng Highway

        WANGHongchang,MAZhifu,ZENGQing,HUANGuangkun(No.11-1082)

        Application of Hydraulic Blasting in Excavation of Laogeshan Tunnel

        LIUJunjie(No.11-1087)

        Countermeasures for Floating of Large-diameter Slurry Shield Tunnel in Soft Soil

        WANGXin,LITingping,WANGYinchang(No.12-1168)

        Technology for Concreting of Integrated Drainage Ditch and Cable Channel of High-speed Railway Tunnels in One Operation

        YINZhonghui(No.12-1175)

        Case Study on Consolidation of Water-rich Cobble/gravel Strata in Nanning by means of Soletanche Grouting

        RENGuohong(No.12-1183)

        Analysis on System Error of Horizontal Angle Survey of CPII Track Control Network of Long Tunnels and Countermeasures

        DUZhigang(No.12-1191)

        ConstructionMachinary

        Analysis on and Countermeasures for Unbalanced Forces on Cutterhead of Large-diameter Shield

        HANWeifeng,ZHOUJianjun,LIFengyuan(No.1-78)

        Analysis and Control of Grease Consumption of Main Bearing of a Shield

        LIDawei,ZHAOXinhe(No.1-83)

        Case Study on Refurbishment of Cutterhead and Main Drive of Slurry Shield for Xiangjiang River Crossing Tunnel in Changsha,China

        BUZhuangzhi,PUXiaobo,FENGPeipei(No.1-88)

        Design and Application of Mountain-climbing Belt Conveyor System: Case Study on West Qinling Tunne

        ZHANGXuejun(No.2-167)

        Analysis on Causes for Failure of Main Drive Reducer of Shield Machine

        CHANGKonglei,ZHAOXinhe,LIDawei(No.2-173)

        Finite Element Analysis and Tests on Digging Device of an Open Shield Machine

        YANGHaitao(No.3-280)

        Development of HMI Configuration of Monitoring System of Shield Machine

        TANShunhui,MENGXiangbo,XUShoutian,PUXiaobo(No.4-380)

        Prediction of Bearing Comprehensive Rock-machine Experiment Platform based on Phase Space Reconstruction and Least Squares Support Vector Machine

        LIHongbo,ZHOUJianjun,WANGZhufeng,ZHANGHepei,RENYingying(No.4-387)

        Technical Reform of Electrical System of Rock Drilling Jumbo

        SHENGuili,WUChaolai,LIANGYongfei(No.4-392)

        Design and Application of a New Rear Propulsion System for Large Cross-Section Rectangular Tunnel Boring Machine

        SHENPeijian(No.6-576)

        Design and Type Selection of Shields Adaptable to Heterogeneous Ground in Shenzhen,China

        TANShunhui(No.6-582)

        An Optimized Design of Layout of Thrust Cylinders Fitting for Two Types of Segment Ring Divisions

        XIAOJunxiang,YUANWenzheng(No.6-588)

        Design of and Study on Advance Timbering ofφ6.22 m Open Shield

        CUILishan,WANGJianhui,YANGHaitao(No.6-592)

        Design of Electrical Control System of Diesel Locomotive Based on TTC60 Controller

        WANGShuangwang,SUNZhihong(No.6-598)

        Reform of Hydraulic Oil Tank of Rock-drilling Jumbo and Analysis on Its Heat Balance

        WUXiangbin(No.7-703)

        Study on Localization of Main Drive Reducers of Shield

        LIUJinxiang,CHENKui,SUNShangzhen,FENGHuanhuan(No.8-790)

        Reconnection Control System of Frequency-conversion Traction Locomotives Based on PLC

        WANGQian,MENGYanlong,SUNZhihong(No.8-797)

        Application of Vehicle-mounted Mobile Substation in Construction of Jilin-Tumen-Hunchun Passenger-dedicated Railway

        GAOHong(No.8-802)

        Comparison of Control Modes of Hydraulic Thrust System of Shields

        JIALianhui(No.9-913)

        Conceptual Design on a Non-cutterhead EPB Shield

        LIJianbin,WANGKai(No.10-1001)

        Case Study on Type Selection of Shields for Chengdu Metro

        CAOZhi,LIJianxiang(No.10-1005)

        Failure Types of Main Bearing of TBM and Analysis on Faults of Main Bearing of TBM Applied in Construction of West Qinling Tunnel

        WANGYanbo(No.10-1011)

        Analysis on Causes for Damages of Main Bearing of TB880E TBM

        ZHANGHongyao(No.11-1092)

        Key Technologies for Design of Super-large Rectangular Pipe Jacking Machine

        JIALianhui(No.11-1098)

        Development of Real-time Monitoring Data Reporting System of Shield Machine

        MAQiang,PUXiaobo(No.11-1107)

        Study on Synchronous Control Technologies for Cutter Head Driving Motors of Shield

        RENYingying,ZHOUJianjun,WANGZhufeng,ZHANGHepei,LIHongbo(No.12-1196)

        Design and Application of Cutterhead of Shield Boring in Water-rich Sandy Gravel Strata in Chengdu

        ZHANGJianian,HUYujuan(No.12-1202)

        Optimization of Arrangement of Thrust Cylinders of Dual-mode Shield for Inclined Tunnel

        TAOWei,GUANHuisheng,GUOLichang,HUANGSonghe(No.12-1207)

        国产思思久99久精品| 亚洲中文字幕成人无码| 国产啪精品视频网站| 超碰97人人射妻| 久久亚洲私人国产精品| 国产亚洲精品福利在线| 亚洲女同性恋激情网站| 国产成人自拍视频播放| 免费人成激情视频在线观看冫| 国产精品美女久久久久久久| 专区亚洲欧洲日产国码AV| 国产黄色看三级三级三级| 日韩女同精品av在线观看| 无码一区二区三区中文字幕| 成人免费毛片内射美女-百度 | 国产AV无码无遮挡毛片| 久久综合久中文字幕青草| 日本av在线一区二区| 国产精品丝袜久久久久久不卡| 国产艳妇av在线出轨| 日本一区二区视频免费在线观看| 日韩国产人妻一区二区三区| 亚洲国产成人va在线观看天堂| 无码午夜剧场| 久久综合给合久久97色| 成人av一区二区三区四区| 国产在线无码精品无码| 男人扒开女人下面狂躁小视频| 中文字幕国产精品中文字幕| 国产亚洲3p一区二区| 蜜臀性色av免费| 国产精品无码精品久久久| 人人妻人人澡av| 人妻少妇精品视频一区二区三区l| 丰满少妇三级全黄| 亚洲综合无码一区二区三区| 蜜桃av多人一区二区三区| 中文字幕亚洲一区视频| 熟妇人妻无码中文字幕老熟妇| 欧美日韩亚洲精品瑜伽裤| 精品专区一区二区三区|